bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?
Q: Use the information given below for all questions about this scenario. James Johnson (also known as…
A: Cycle Time = Time available / Units required in given time = 60 minutes /…
Q: For a food-processing plant such as Kraft Foods, capacity refers to the number of employees working…
A: Introduction: The term Business refers to an exchange of goods and services between the buyer and…
Q: A bank receives loan applications from 6 customers a day. The bank has promised customers that…
A:
Q: A manufacturing process has 12 workers and 6 stations. The process is completed in the order given…
A: Given data: Station Staffing Processing time(hours per unit per worker) A 2 2.20 B 1…
Q: In a manufacturing system, the technique of deciding how to assign work to specific workstations…
A: Assigning work to a secific workstation is crucial because it affects the efficiency of the task.…
Q: Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the…
A: Given Information: Cabinet Maker 1 Cabinet Maker 2 Cabinet Maker 3 Hours required to…
Q: (a) Develop a sequence using SPT based on processing time for preparing the area.
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: There is an upstream Picking department that feeds two downstream Packing departments: Pack Singles…
A: We have to pack 47880 units in Multis which is accounted for 60% of the volume. Hence, Overall…
Q: PepsiCo sells its soft drinks in approximately 400,000 retail establishments, such as supermarkets,…
A: Research is an organized and planned method of finding answers to the questions. It is a long…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A: If the total load on the workstation is beyond the work capacity of the center, then it becomes a…
Q: A manufacturing company produces four parts that require the use of a lathe and a drill press. The…
A: Let us assume that Xj is the number of Part-j that is to be produced for j=1,2,3,4 & Also, let…
Q: Consider again the case of One Hour Loan. Recall that activity 1 takes 4 minutes/loan,activity 2…
A:
Q: Write the Objective Function and Constraints for this problem.…
A: Let X1 = Number of the unit of product A produced X2= Number of the unit of product B produced X3 =…
Q: If a flow unit type j does not consume any time at a resource i, the corresponding cell inthe…
A: The corresponding cell of the type j cell in the workload matrix, which is referred as WL (i, j)…
Q: Minimum number of work stations to balance this process
A: Workstation balancing is the process of allocating activities to different workstations based on the…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A: Given data, Work Center - W, X, Y, Z Days of work = 5 per week Market Demand = 50As, 60Bs , 70…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A:
Q: Consider a two-step process that handles three types of customers. Each resourceis staffed by one…
A: Bottleneck Process Bottleneck in operations is a step in a process that limits the ability of other…
Q: In her last semester at SPC, Polly Hedron needs to take Statistics, Composition 2, Ethics, and…
A: given, She has 14 choices for statistics, 19 choices for composition, 17 choices for ethics, 18…
Q: Joe’s commercial laundry has contracts to wash bedsheets for hotels. Joe intakes each batch of…
A: Here, the ironing process has the least capacity per hour. Hence, the ironing process is the…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A: : Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question and…
Q: A manufacturing company produces four parts that require the use of a lathe and a drill press. The…
A: Assume that Xj is the number of Part-js to be created for j=1,2,3,4 and that di+ and di- are the…
Q: Digos Mineral Inc. is in water refilling. The following information pertains to its operations…
A: Given data is Processing time = 40 minutes Inspection time = 7.5 minutes Waiting time = 7.5 minutes…
Q: At a manufacturing assembly line, 30 jobs arrive perhour. Each job must pass through two production…
A: Given data, The arrival of job =30 job per hour Production Stage Stage 1 - Average 1 minutes to…
Q: A medical office treats two different types of patients, new patients and existing patients. The new…
A: The capacity utilization rate quantifies the proportion of an organization's potential production…
Q: Solve the question below using the attached excel templates with formulas for renting both slow and…
A: Employee's time worth (per hour) $15 Need of employees per hour 4 Slow copier Cost of…
Q: The Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The…
A: The following information is given to us for the two copiers, fast and slow. Slow Copier - Rent is…
Q: A company produces three products A,B, and C. The products are processed through three machines as…
A: Since standard time unit is not given we are assuming it to be hours.
Q: Katie Posh runs an upscale nail salon. The service process includes five activities that are…
A: Given Activity 1: Welcome a guest = 1 minute Activity 2: Clip and file nails = 3 minutes Activity…
Q: zing a copier ats (for slow system) of time ce rate tputs rect outputs from Inputs man time between…
A: From the given information, The department believes that the employees time is worth $15 per hour.…
Q: Using linear programming, determine how many pieces of poloshirts and how many pieces of t-shirts…
A: Using linear programming, determine how many pieces of poloshirts and howmany pieces of t-shirts…
Q: A bottled water production process is described by the following flowchart. Production Setup 40…
A:
Q: A small shoe manufacturer makes two styles of shoes: oxfords and loafers. Two machines are used in…
A: Let x be the no. of oxfords style shoe y be the no. of loafers style shoe The total manufacturing…
Q: A machining center has the following small jobs from five of its customers. The jobs are listed in…
A: FCFS Job Total processing time Due date (in hours) Flow time Tardiness Patel 8 5 8 3 Smith 5…
Q: een Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new…
A: Let x be the no. of Car C1 And y be the no. of Truck The objective value. Max Z=225x+275y…
Q: Personnel Department costs are allocated on the basis of employee hours and Support Department costs…
A: In the above question, the direct method of allocation is used as the clinic has two service…
Q: A final assembly plant for a certain automobile model is to have a capacity of 240,000 units…
A: Data Given Annual production = 240,000 unit Operating time(t) = (50 week/yr * 5 days/week * 8…
Q: The supervisor of ABC Corp. wishes to assign a number of workstations to an operator based on…
A: Consider
Q: flow rate for unit B
A: Flow rate indicating the maximum number of units can produced in a process layout. Here, we can…
Q: Katie Posh runs an upscale nail salon. The service process includes five activities that are…
A: Listing out the duration of each activity (5 nos.) and servers (3 nos.) below: The sum of all…
Q: "Ruby runs a machine design shop that has 4 stages of process in succession. Stage i is cutting that…
A: Given data:
Q: Considering the concept of constraint management, what are a few of the challenges of managing…
A: At first it is important to know the concept of constraint management. The word constraint depicts…
Q: CWD Manufacturing makes three components for sale to refrigeration companies. The components are…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: daily report of the production plant. Calculate the mean, median, and mode
A: A ‘Daily Production Report’ is a record which documents the levels of production & other data.…
Q: A company makes four products that have the following characteristics: Product A sells for $75 but…
A:
Q: Posh Nails Katie Posh runs an upscale nail salon. The service process includes five activities that…
A: The wages that are incurred for buying the goods and services to the customer is known as direct…
Q: There are three sequential operations (Station 1, Satiation 2, and Station 3) in a process. Incoming…
A: Theoretical flow time indicating the time required to complete a single task. Here, we can calculate…
Q: In a manufacturing system the technique of deciding how to assign work to specific work stations (…
A: Production is the process of manufacturing products for consumption purposes to sell in the market.
bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Exercise Published by Tutor The company (from the previous example) producing training sets for basic operations with SMD components produces them in a total of 3 of its factories: New York factory, the Washington factory, and the HK factory. In total, the company will produce a total of 420 teaching sets. The New York factory will produce 50% more sets than the total production in Washington and HK combined, and the production in Washington factory is 10% higher than in HK factory. How many sets are produced in the individual production factories? The tutor published the attched solution(pic). Based on the attached solution and the exercise description can you explain me how was the total production,constraints row was constructed ?DreamInflate is a balloon manufacturing company. Balloon manufacturing consists of seven work stations, each performing a single step as indicated in the table below. There are five workers manned for the seven work stations as shown. Assume the workers are paid $15 per Worker Task Sequence Processing Time (secs/balloon) Task Dye production Electrocharging Dipping (Cold and Hot) Mortar Dipping Balloon inflation and delaltexing Vulcanization Inspection/Testing 1 30 w1 20 3 35 W2 25 W3 30 W4 6. 45 W5 7 40 hour. Each balloon pack is sold for $6 and has a variable cost of $1. The company has fixed costs of $200 per hour. There is more demand than the overall production system can provide. Based on the information provided, answer the following questions: • What is the cost of direct labor for balloons? • How much profit does DreamInflate make every hour? (note that the cost of direct labor is also a variable cost). What would the profit of DreamInflate be if the variable costs were 10…A local bakery is renowned for its elaborately cecorated sheet cakes. Consider the following process information: One baker is ivailable to prepare the cake batter (measuring and mixing ingredients and then adding it to baking pans). On average, this takes 10 minutes to prepare two cakes, ie. to make enough batter for 2 cakes and to add the batter to 2 cake pans. Move time to add and remove them from the oven is neglig bile, it takes 32 minutes to bake cakes - the bakery has two ovens, each able to hold 2 cakes. The one pastry chef on staff puts on an amazing show that draws a crowd all day-each cake is decorated in 6 minutes. The bakery operates 8 hours per day. Answer each of the following questions: a. What is the cycle time (in minutes per cake) of each stage - preparing, baking, and decorating? b. What is the dally process capacity? Explain. c. If orders arrive at a rate of 3 cakes every 20 minutes, can the bakery meet the caily demand Explain, Note: Be clear about how you…
- Cubway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes taking order from the customer. After this, Tim prepares bread and Kim prepares filling for the order. These activities are performed in parallel, and take 6 and 12 minutes respectively. Jim then assembles the bread and filling, which takes 4 minutes of his time. Finally, Tim spends 1 minutes in delivering the order and taking payment. What is maximum number of sandwiches Cubway can make per hour? (In other words, what is the capacity of the process in sandwiches per hour?)A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 7 units/hr 5 units/hr Assembly 0.8 units/hr Sawing Sanding Welding Assembly 2.1 units/hr 0.8 units/hr Drilling 2.5 units/hr Assembly 0.8 units/hr a) is the bottleneck. b) The bottleneck time is minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places).A work cell in a local manufacturer has a workstation with 4 machines that form a line (Machine 1-Machine 2-Machine 3-Machine 4). Each unit needs to pass through each machine in order to be completed. Each machine has a production capacity of four units per hour. What is the process time of the work cell in minutes per unit? 15 4 8 16
- The ClickClock corporation produces clocks with six stations. Each station is manned by a human worker, who do the following tasks: These workers get paid $ 10 an hour. Ignore any Station Task Sequence Processing Time (secs) Task Heat-stake lens to bezel Inspect bezel Clean switch holes Install set switch in bezel Total time for A Check switch travel Clean inside bezel Install module in bezel Total time for B Install battery clip in module Heat-stake battery clip in module Install two batteries in module Check switch 14 2 26 A 3 10 Preparation 1 4 18 68 23 B 6 12 Preparation 2 7 25 60 8 20 9 20 Battery 10 22 Installation 11 8. Total time for C 70 Install band Inspect band Total time for D Cosmetic inspection Final test D 12 45 Band 13 13 Installation 58 E 14 4 Packaging 15 71 Preparation Total time for E 75 Place watch and cuff in display box Place cover in display box base 16 20 17 14 Watch 18 Place owner's manual and box into tub 30 packaging Total time for F 64A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). 6 units/hr Sawing 2.5 units/hr Sanding Drilling 1.8 units/hr Welding 7 units/hr Assembly 0.7 units/hr Assembly 0.7 units/hr Assembly 0.7 units/hrThere is a manufacturing company that has a dedicated production line to make one specific product. The line has three stations working in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3. The output from station 3 is the finished product. Station 1 can process 500 units per week, station 2 can process 300 units per week, and station 3 can process 400 units per week. illustrates this problem. Question Answer ↓ What is the maximum output number per week?
- A manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the i nished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?A bottled water production process is described by the following flowchart. Production Setup 40 seconds /pack Bottle Sanitization 40 seconds /pack Water Filtering 70 seconds /pack Conveyor Belt 20 seconds /pack Bottle Filling 120 seconds /pack Bottle Filling 120 seconds /pack Bottle Filling 120 seconds /pack Packing 60 seconds /pack First, the process is set up for 40 seconds per pack of 6 bottles. Bottles making up each pack are then sanitized for 40 seconds per pack, while water 15 filtered for 70 seconds per pack. A conveyor belt then takes 20 seconds to transport each pack to one of three identical bottle filling stations. A bottle filling station takes 120 seconds to process each pack. Finally, the products go through a single packing station, which takes 60 seconds/pack. 1 1.What is the bottleneck activity in this production process? Answer: 2. What is the total capacity of the process? Answer: 3. What is the total flow/processing/throughput time of this production process?Three employees at a fast-food restaurant each perform one of the three activities in serving a customer: take the order, process the order, and deliver the order. The processing time for each activity is given as follows: Activity Processing Time Take the order 30 seconds Process the order 2 minutes Deliver the order 1 minute Assume that the demand is 20 customers/hour. What is the average labor utilization? a 38.9% b 85.7% c 66.7% d 100%