XOX Corporation's management keeps track of the time it takes to process orders. During the most recent month, the following average times were recorded per order Wait time 15. 6 Inspection time 0.8 Process time 1.6 Move time 0.7 Queue time 3. 9 1. Percentage of manufacturing cycle time spent on non-value-added activities 2. Compute the delivery cycle time in days
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 11.5…
A: Given, Waiting time before the start of the batch = 2 hours Setup time = 2 hours Waiting time for…
Q: The following data pertain to operations at Quick Incorporated: Throughput time…
A: Throughput time is the total time taken to produce the product in the manufacturing process of…
Q: A printing shop receives an average of 1 order per day.The average length of time required to…
A:
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 12.75…
A: Find the given details below: Given details: Flow time 12.75 hours Waiting time before…
Q: Max Stamp approves study abroad documents for the university. Students must wait in line with their…
A: A queuing system refers to models concerning systems of providing service where customers arrive,…
Q: Additional Algo 5-6 Flow-Dependent Processing Times Two-types of student come to the career-services…
A: Scheduling with time-dependent processing times is concerned with scenarios where work processing…
Q: Kanban is the Japanese word for:a) car.b) pull.c) card.d) continuous improvement.e) level schedule.
A: c) card.
Q: The stylish hair salon has three stylists who provide services to women. After checking in with the…
A: Average throughput time is calculated by adding four steps of the manufacturing process i.e.,…
Q: (a) Develop a sequence using SPT based on processing time for preparing the area.
A: Sequencing is an appropriate order of plan as per which the process of operations works. It defines…
Q: You observe a bank and notice that a customer leaves the bank about every five minutes.These five…
A: Cycle Time is the time taken by an individual unit under the process. Cycle time can always be…
Q: The Shady Farm Milk Company can process milk at a fixed rate of 6,200 gallons/hour. The company’s…
A: given, fixed rate of 6,200 gallons/hour clients request 104,000 gallons of milk over the course of…
Q: A manufacturing company produces four parts that require the use of a lathe and a drill press. The…
A: Let us assume that Xj is the number of Part-j that is to be produced for j=1,2,3,4 & Also, let…
Q: Select the right choice of the multiple questions LIFO order technique used in a Select one: a.…
A: Last in, first out is abbreviated as LIFO. It's a data structure processing approach in which the…
Q: The students information like Name, GPA, Major subjects etc., about a particular is stored in the…
A: A) Student Record:- An understudy/student record is one that: Is kept up by the University or…
Q: CodeDeskInc matches programmers with freelance jobs. It has 30 employees who staffits online chat…
A: Active chat sessions=Average request per hour×Chat session timeMinutes per hour=240×560=20
Q: Bectol, Inc. is building a dam. A total of 10 million cuft of dirt is needed to construct the dam. A…
A:
Q: Given this set of daily service operation, assuming a processing order of A-B-C-D-E; Determined the…
A: If four cycles are used, then the inventory size of the operation can be minimized and be more…
Q: Claims received by Healthwise Insurance Company are en-tered into the database at one station, and…
A: Solution Applying Johnsons rule, we get - Johnson's rule is: Pick the one with the shortest…
Q: The boss at the Precision Machine Shop needs to de-finish the personnel policy,which minimises all…
A: Given that: For junior attendant: λ = 8 μ = 10 For junior attendant: λ = 8 μ = 16
Q: Operations typically differ in terms of volume of output, variety of output, variation in demand or…
A: The correct option is (A)
Q: A service system is a O a. Configuration of resources and technology to deliver intangible items O…
A: Intangible items are those items that cannot be touched and have no physical appearance.
Q: The check-out area of a grocery store has the average customer interarrival time = 2 minutes, the…
A: Given, Interarrival time of customers = 2 minutes. In one minute period, 1÷2 = 0.5 customers arrive…
Q: Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken,…
A: Following formula can be used to calculate implied utilization rate: Firstly, the workload needs to…
Q: Kitty Wonderland (KW) makes toys for cats. KW’s managers have recently learned that they can…
A: Solution of the above problem is as follows:
Q: Which service process structure typically involves work flows with steps that vary from one customer…
A: Service process structure is a type of structure that determines how inputs and output of a process…
Q: Rajesh, a Junior System Administrator with the MIS department, clocked in 4 minutes and 27 seconds…
A: Business ethics describes the morals and principles an organization approved in its whole…
Q: ter at a large regional hospital provides training sessions in CPR to all employees. Assume that the…
A: Following will be the definitions : Efficiency = (Actual output ÷ Effective capacity) × 100…
Q: Why is it important to view a batch-process operation as a network of interconnected queues?
A: Batch process operation is a type of operation in which a fixed no. inputs are loaded into the…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 0.38…
A: GIven Information: Capacity for the first resource: 0.38 applications per minute Capacity for the…
Q: The definition of work-in-process (WIP) inventory is: Select one: a. An end item ready to be sold,…
A: A manufacturing unit has different kinds of inventories such as; Raw material inventory Material…
Q: You operate a process with three workstations; the cycle times are given below. A regular batch is…
A: Given: You operate a process with three workstations; the cycle times are given below. A regular…
Q: hree jobs are in the queue. The number of tickets each has and the number of seconds of processing…
A:
Q: XOX Corporation's management keeps track of the time it takes to process orders. During the most…
A: . Delivery cycle time = Wait time + Throughput time Throughput time = Process time + Inspection time…
Q: What inverse operations is used to solve equations 2x=10
A: 2x = 10 There are 2 ways to solve this
Q: The time from when a patient is discharged from NorthShore Hospital to the time the discharged…
A: Solution a) The x-chart in conjunction with an R-chart is drawn by calculating following limits-…
Q: GV is a small accounting firm supporting wealthy individuals in their preparation of annual income…
A: Given data: *As per guideline first 3 parts are answerable, repost remaining part.
Q: A veterinary office with three processes (examination, greeting, and checkout) has two types of…
A: Below is the solution:-
Q: Having too much capacity is just problematic as not having enough capacity. Select one: True False
A: Having too much capacity is just problematic as not having enough capacity
Q: To keep track of the queue and meet deadlines, two things are required: meticulous scheduling and…
A: Queue management techniques are used to handle queues in a system.
Q: 1. When is the best time to do the cycle count? and give examples of cycle count methodologies.
A: The cycle count method provides the correct amount of stock available in the warehouse. This method…
Q: WIP is an abbreviation for O a. work-in-process O b. waiting inventory potential Oc waiting…
A: An abbreviation refers to the short form of a word/phrase/saying that is shortened to make an…
Q: Provide examples of fours situations where there is limited or finite waiting line
A: To Be Determined: The four possible examples demonstrate four situations in which there is a limited…
Q: Define Process Flow Time Reduction with example?
A: Flow-Time Reduction is getting each product, job, and process project completed sooner and faster in…
Q: A work system has five stages with processing times of of 6, 4, 2, 8, and 10 mins/unit. A product…
A: Given- A work system has five stages - Processing times for stages are 6, 4, 2, 8, and 10 mins/unit
Q: ious speeds and requires periodic tool regrinding at the intervals cited. Speed Output per Hour Tool…
A:
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 14.35…
A:
Q: Suppose a radiology department uses FCFS to determine how to sequence patient x-rays. Assuming these…
A: Find the given details below: Given Details: Patient Processing Time (Mins) Due time A 35 140…
Q: The Delacroix Inn in Alexandria is a small exclusive hotelwith 20 rooms. Guests can call…
A: Housekeeping is available from 8am to Midnight i.e. for 16 hrs Total no: of rooms= 20 Calls/room=…
Q: What is the total idle time of the process assuming unlimited demand?
A: Idle time is the time measured minus the total process time by the total cycle time.
Q: Required: Which segment is more efficient in terms of manufacturing efficiency? How can management…
A: Throughput time is the total time incurred in the production process to manufacture a product.
XOX Corporation's management keeps track of the time it takes to process orders. During the most recent month, the following average times were recorded per order
Wait time 15. 6
Inspection time 0.8
Process time 1.6
Move time 0.7
Queue time 3. 9
1. Percentage of manufacturing cycle time spent on non-value-added activities
2. Compute the delivery cycle time in days
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Recall "Tommy's Dresses to go" case. Three years after, this company still rents designer dresses to customers, but it has managed to streamline its internal processes and expand to different segments of demand. Now, customers can rent clothes for anywhere between 1 days to 30 days, and each customer is sent only one (1) dress (instead of 2 dresses described in the case). The company alsó takes only 13 number of days to turn around a dress (i.e., this the duration starting with return from a customer, to again being rented out to a customer). The current demand is an average of 1,000 customers per day, and the company owns total of 30 thousand dresses. What is the average rental duration? (i.e., what is the average number of days, a customer keeps a dress).Schlarbaum Corporation's management keeps track of the time it takes to process Orders. During the most recent month, the following average. times were recorded order: per Wait time Inspection time Process time Move time Queve time Days 3.2 0-2 1.3 0.8 6.9 Required: a. Compude the throughput time. b. Compute the manufacturing cycle efficency C. what percentage of the production time is Spent in non-value-added activities. d. Compute the delivery cycle timeComplete a fish-bone chart explaining how a pizza delivery can arrive late on a Friday or Saturday. Match each number in the chart with corresponding reason. I Manpower Not enough training Ingredient shortage Not enough boxes Drivers get lost Material Low pay/ high turnover II Source of error 11 III IV III Methods Turnover Training not sufficient Machinery Can't handle large orders Credit card machine broken Too few phones Reason Oven breaks ▼ IV ▼ ▼ Late weekend pizza delivery
- What is one important advantage of a Make-To-Stock process? Group of answer choices Can respond quickly to customer demand Creates greater flexibility Less likely to have obsolete inventory More environmentally sensitivePizza Egoli (Pty) Ltd has eight outlets in Gauteng. All these outlets are owned by the company. Decisions are centralised and are made by the original founder of the business. All outlets use wood fires when making the pizzas. However, due to clients complaining about the time that it takes to make the pizzas, top management has decided to completely revise the processes in the outlets – from ordering the pizzas to receiving the final product. This meant that at least two employees per outlet will lose their jobs as new types of skill will be required in the outlets.Question:Suggest a change process to the Top Management of Pizza Egoli (Pty) Ltd that will ensure that the outlets are managed successfullyCreate a business scenario/description. 2) Based on the business description created, construct an Order Processing flow chart that is appropriate for the business.
- Which of the following statements are correct about services and service design? Select ALL which are true. 1) Services can be more easily automated and transported than products. ) 2) The service delivery system should be designed primarily around the employees in the system. ) 3) Low-contact services can usually be made more efficient than high-contact services. 4) A service is produced and consumed simultaneously (at the same time).In job order costing systems, costs are accumulated and assigned to: a) Departments b) Products or jobs c) Overhead pools d) Fixed assetsXOX Corporation's management keeps track of the time it takes to process orders. During the most recent month, the following average times were recorded per order Wait time 15.6 Inspection time 0.8 Process time 1.6 Move time 0.7 Queue time 3.9 Compute the delivery cycle time in days. Percentage of manufacturing cycle time spent on non-value-added activities.
- Each Triam Deluxe gamer computer system consists of two speakers, a monitor, a system unit, a keyboard, and an installation kit. These pieces are packed together and shipped as a complete kit. In MRP terms, all of these items are level 1 items that make the level 0 kits. Complete the MRP records, using the following information: • Production plans for complete kits are as follows: Start assembling 4,500 kits in week 2 Start assembling 1,000 kits in weeks 3, 4, and 5 Start assembling 8,000 kits in week 6 • The gross requirements for the system unit have already been given to you. For the remaining items, you will need to figure out the gross requirements. • All scheduled receipts, lead times, and beginning inventory levels are shown. Click the icon to view the MRP records. Construct the material requirements plan for item System unit (enter your responses as whole numbers). System unit: Lead Time = 1 week; Minimum order quantity = 3,500 Week 1 2 3 Gross requirements 4,500 1,000…Using a flowchart, prepare the high-level process of the following:1. Procure to Pay2. Order to Cash3. Record to ReportWhich of the following problems are not among those hidden when inventory levels are excessively high? A) Inadequate worker motivation B) Engineering design redundancies C) Scrap D) Productive equipment downtime E) Paperwork backlogs