preview

PSH-484 Week 1 Assignment

Satisfactory Essays

Redlined P&ID and email confirmation which validates the PSH-484 trip set point of 1400 psig was sent to the FEIM Analyst for updating this change on the TXF271A00216 drawing. Since the facility package of drawings is in the process of field verification reviews, the additional redline setpoint change is captured with that

Get Access