A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $16 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost? Click the icon to view the table of carpentry and painting hours. The optimal integer solutic which is $. (Type whole numbers.) Carpentry and Painting Hours Flats Hanging Drops Props Carpentry 0.5 3.0 2.0 Painting 2.0 13.0 3.0 D - X prop(s) and rent prop(s). This solution gives the cost,
A community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $16 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost? Click the icon to view the table of carpentry and painting hours. The optimal integer solutic which is $. (Type whole numbers.) Carpentry and Painting Hours Flats Hanging Drops Props Carpentry 0.5 3.0 2.0 Painting 2.0 13.0 3.0 D - X prop(s) and rent prop(s). This solution gives the cost,
Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter4: Linear Programming Models
Section4.8: Data Envelopment Analysis (dea)
Problem 42P
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 4 images
Recommended textbooks for you
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,