b) and protecting valve. There is a large river of fresh water (having the density of 1000 kgm) in the northern area of England available for storage where the water level changes by 3.8 m an exit having a potential of installing a small size hydroelectric power station. If the river has a typical flow of 0.1 cumecs (cubic metre per second). L i. If the turbine/generator efficiency is 70% then calculate the amount of power available? W. Determine the maximum installed capacity for continuous electrical power generation? iv. How much energy, in kWh, this hydroelectric power station can generate if it is operated for 15 hours if the plant efficiency is 70% ? What will be the annual energy capture, in kWh, for the case if the load factor is 40%7

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.31P: Consider two interconnected voltage sources connected by a line of impedance Z=jX, as shown in...
icon
Related questions
Question

Plz plz solve all four parts

b)
and protecting valve.
There is a large river of fresh water (having the density of 1000 kgm) in the northern
area of England available for storage where the water level changes by 3.8 m an exit
having a potential of installing a small size hydroelectric power station. If the river has a
typical flow of 0.1 cumecs (cubic metre per second).
L
M.
Iv.
Determine the maximum installed capacity for continuous electrical power
generation?
If the turbine/generator efficiency is 70% then calculate the amount of power
available?
How much energy, in kWh, this hydroelectric power station can generate if it is
operated for 15 hours if the plant efficiency is 70%?
What will be the annual energy capture, in kWh, for the case if the load factor is
40%7
Transcribed Image Text:b) and protecting valve. There is a large river of fresh water (having the density of 1000 kgm) in the northern area of England available for storage where the water level changes by 3.8 m an exit having a potential of installing a small size hydroelectric power station. If the river has a typical flow of 0.1 cumecs (cubic metre per second). L M. Iv. Determine the maximum installed capacity for continuous electrical power generation? If the turbine/generator efficiency is 70% then calculate the amount of power available? How much energy, in kWh, this hydroelectric power station can generate if it is operated for 15 hours if the plant efficiency is 70%? What will be the annual energy capture, in kWh, for the case if the load factor is 40%7
Expert Solution
steps

Step by step

Solved in 6 steps

Blurred answer
Knowledge Booster
Maximum power transfer theorem
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning