lease do the conversions. 11404.8 feet to sqft 11404.8 feet to acre
Q: 1. Determine the moments at each joint of the frame shown in Fig. El is constant. Using moment…
A: Main frame:
Q: The recorded rainfall at 4 raingauge stations in an area for a period of 8 years is given below Year…
A: Arithmetic mean method: If the normal annual rainfall at A, B and C are to be within 10% of the…
Q: Q3) In the figure, fluid flows from reservoir A to reservoir B with a flow rate of Q-400 lt/s with…
A: Flow rate Q = 400 lt/s = 400 × 10-3 m³/s = 0.4 m³/s Length…
Q: Figure 2 of 2 T Part D Specify the degree of indeterminacy. Express your answer as an integer.…
A: Determine the degree of Indeterminacy (DSI) of the frame.
Q: "What is the point of architecture?" Map a project in architecture and design.
A: "What is the point of architecture?" Map a project in architecture and design.
Q: What is the maximum absolute shear in the following beam? Use L = 20, a = 4, b=4, P₁ = 4, P2=5, and…
A:
Q: Write the shear and moment equation. Draw the shear and moment diagram.
A: To write the equations for Shear forces (SF) and Bending Moment (BM).
Q: 1.20 If the specific volume of a gas is 360 ft³/slug, what is its specific weight?
A: Specific volume of the gas, Vs=360 ft3slug.
Q: A column with one end fixed and one end free has a critical buckling load of 100 N. For the same…
A:
Q: Diagram shows a loop traverse, along with the raw, or unadjusted, field data oop Traverse 64° 21'15"…
A:
Q: Q14/ The mass of each ball of a proell governor are 9.6 kg. Each of the arms is 305 mm Mong. The…
A:
Q: h = 10⁰ -xx=666 in ly=426 in 21'-0" 28-0 L=? 1. Given the allowable stress table for wood timbers…
A: b = 8 in h = 10 in Ix = 666 in4 Iy = 426 in4
Q: A 4-cell aquifer model is conceptualized in the figure below. Cell 1 River Cell 2 Cell 3 Cell 4 (a)…
A: width of the aquifer strip = 3 km length of each cell = 5km recharge rates - aquifer strip in cell…
Q: Using Equivalent eccentricity method design a square short column having Pu = 700 kip, Mux = 140…
A: Pu =700kip Mux = 140 k-ft Muy = 200 k-ft Fc' = 6000psi Fy = 60000psi It has been asked in the…
Q: Two plates are connected by a bolt as shown in the figure. What is the shear stress on the bolt? D…
A:
Q: Conduct the force analysis of the structure for the given set of loads (shown in Figure 1), and…
A: To determine:Axial forces in truss elements
Q: Situation 6: Determine the total stress at points A, C, and D in the eccentrically-loaded post…
A:
Q: P5: If water flows from the upper to the lower reservoir as shown in figure at a rate of 0.028m³/s…
A:
Q: After primary treatment, a municipal wastewater contains 150 mg/L BOD5. The wastewater flow of 0.44…
A: To determine- Aeration volume (m3)
Q: Q#4:The table shows data of a wastewater sample collected from a river with a temperature of 30 °C…
A:
Q: 1 For the square foundation below determine: a) ultimate settlement and b) settlement after 140 days…
A: Ultimate Settlement=Sult=0.126 ft Settlement after 140 days=S140=0.087 ft Saturated unit weight of…
Q: Conduct the force analysis of the structure for the given set of loads and provide the following:…
A: To determine:Axial forces in truss elements
Q: The beam shown will be constructed from a standard steel W-shape using an allowable bending stress…
A: Allowable bending stress, σallow=70.4 ksi
Q: (b) A cylinder 2.4 m diameter weighs 2 KN and rest on the bottom of a tank which is 1 m long. As…
A:
Q: USE CONJUGATE BEAN AND SUPERPOSITION AT A TO FIND SLOPE AT B A mum 20 kN/m 5 m C 30 kN/m 5m B
A: Given: Required : Slope at B
Q: Can only particular prospective systems be utilised in a construction?
A:
Q: A small lake with a volume equal to 500,000 m³ is approximately completely mixed. The lake is used…
A: V= 500000 m3 Q= 1000m3/d Runoff = 200 m3/d for 200 d
Q: 20 kN/m ↓↓ 4 m 3 m 2 m 30 kN a 1.5a A beam is supported by a column 3 m tall with dimensions a x…
A: Column length= 3 m E = 25 GPa
Q: 3 1 1 2 3 4 5 6 8 ly sunny Area Calculation NEVER A - 200.00 % Instructions Table below shows the…
A:
Q: Steel, fy (main bars) = 415 Mpa Steel, fyt (ties) = 275 Mpa 1. Determine the minimum spacing “a”,…
A:
Q: What are some of the best things about architecture? Think about a project and how it would look…
A: Architecture has many wonderful attributes that contribute to creating beautiful and functional…
Q: A sand sample has a bulk density of 20kN/m³ and a degree of saturation of 70%. If the specific…
A: Degree of saturation S = 70% Specific gravity G = 2.65 Bulk unit weight γb= 20 KN/m3 Unit weight of…
Q: The moment of inertia of the triangular shaped area is I, = 4.17 x 10 mm. Given m= 100 mm and n =…
A: The moment of inertia of the triangular portion about the x-axis is 4.17×106 mm4 To determine the…
Q: Situation 2: A 2.0 mx 2.0 m footing carries concentrically a square column of 0.40 mx 0.40 m. Design…
A: Footing size- 2m×2 mColumn size- 0.4 m×0.4 mDL=580 kNCC to the centroid of the footing reinforcement…
Q: B Steel E = 29 x 10 psi 7 = 490 lb* in. 4ft D Aluminura E = 10.1 x 10 psi 7 = 170 ³ Determine (a)…
A: For steel strut: E=29×106 psiγ=490 lb/ft3L=4 ft 12 in1 ft=4×12 ind=12 in=0.5 in For aluminium…
Q: A 62-kN vertical load P is applied at the corner of the square cross section of the steel…
A:
Q: Determine the reactions at the supports A, B, D and F. Please draw shear force and bending moment…
A: ##Support Reactions- at A,B,D,F ##and plz draw SFD and BMD
Q: As shown, an I-beam (Figure 2) has a bottom flange that is 350 mm x 70.0 mm, a web that is 70.0 mm x…
A: Given that, Size of Bottom Flange - 350 mm x 70 mm.Size of Top Flange - 175 mm x 70 mm.Web size -…
Q: When it comes to the usage of technology, what are the primary distinctions between computer-aided…
A: Computer-aided architectural design (CAAD) is a software…
Q: Q-1 The beain ABC, Fig. 1, is fixed at A and roller supported at B. Determine the reaction…
A: A beam is given, we need to find out reactions and draw shear force and bending moment diagram
Q: 4. Design a square foundation (find the minimum width) that meets the following two conditions: 1)…
A: 1. Given load , P=800 KN , FOS = 2 2. Ultimate settlement should be less than 0.3m.
Q: Determine the shear strength effective stress on a plane with soil mass at a point where the stress…
A:
Q: Analyze the frame shown and determine the girder moments, girder shears, girder axial forces, column…
A: To determine:Beam momentsBeam shearsBeam axial forcesColumn momentsColumn shearsColumn axial forces,…
Q: 8-11. Determine the horizontal displacement of joint A of the truss. Each member has a…
A: Given: Required : Horizontal displacement at A
Q: A soil sampler has inner and outer radii of 23 mm and 35mm, respectively. The area ratio of the…
A:
Q: 1. ) For the square foundation below determine: a) ultimate settlement and b) settlement after 140…
A:
Q: A highway survey PI falls in a pond, so a cut off line AB= 275.21 ft is run between the tangents. In…
A: Degree of curve = 4°30' Angle A = 16°28' Angle B = 22°16' Station of A =54 + 92.30
Q: Three boards each 50mm thick, are nailed together to form an I-Beam that will be subjected to a…
A: Allowable shearing force for each nail, F= 600 N Spacing between each nail, s = 75 mm Three boards…
Q: Q4/ In Figure shown below, L₁= 300 m, d₁- 600 mm, el= 2 mm, L₂= 240 m, d₂ - 1 m, e₂-0.3 mm, u= 3x…
A: L1 = 300 m d1 = 600 mm or 0.6 m L2 = 240 m d2 = 1 m
Q: 11-18. Determine the moments at A, C, and D, then draw the moment diagram for each member of the…
A: Find: Moments at A,C,D and draw the bending moment diagram using Slope-deflection method.
Step by step
Solved in 3 steps
- What is the content of the Traffic Survey in the paper? What are the examples? Ps. not gradedConsider a Design-and-Build project of a single-entrance toll plaza awarded to XYZConstruction Corp. Based on the traffic surveys conducted during planning phase, it was found out that the present travel demandalong the existing highway isfollows a negative exponential distributionwith a mean of 4XYZkph. On the other hand, the company received three bid proposals of equipment that they may install in the toll servers with their corresponding service rates:Equipment I(random service)0.7Xseconds per vehicleEquipment II(random service)0.5+Y/100seconds per vehicleEquipment III(regular service)0.8Zseconds per vehicleIn addition, the demand is projected to increase annually by a factor of 1.3Z. If you are the transport planner tasked to design the toll facility, determine the following5years hence:i.The average waiting time of vehicles if Equipment Iwill be installed.ii.The average time spent in the system if Equipment IIIwill be installed.iii.What equipmentwould you recommend as the most…Lion heen construcied belweh the mainland and an island The total cost areluding tolls) to travel across the bridge is expressed as C- 50+0.5V, where Visthe ber o veh/h and C'is thc cost/veh in cents. The demand for travel across the bridue is V 2500-10C O Determine the volume of traffle across the bridge. a toll of 25 cents is added, what s the volume across the bridge? What volume Would be expected with a 50 cent increase Aelbooth is to be added, thus reducing the travel time to cross the bridge. The new nction is C- 50 + 0.2V. Determine the volume of traffic that would cross the bridge. d Determine the toll to yicld the highest revenue for demand and supply function in part (a), and the associated demand and revenue.
- q1: Proposed a number of upgrades to the existing BMSASAP PLS I RLLY NEED THIS IN 30 MINUTESFrom the following table, develop network diagram, determine the critical path, andCalculate the minimum duration of project completion.Activity Predecessor DurationA -- 5B A 4C A 3D B 8E B 4F C 6G D,F 4H E 6I F 4J G,H,I 2
- Transportation Engineering subj. Choices for both are: 0.627 0.513 0.487 0.328 Hope you can help me, I will upvote thanks :)Give 1 concrete example of the following: Trip Generation Trip Distribution Modal Split Traffic Assignment(2d) To complement the new rail-project described in question 2a above, the city public-works department has also engaged your design-&-construct company to complete the work necessary for upgrading-repair to a small stretch of an existing city ring-road, to allow better access to an outlying train-station. You are assigned by the project manager of this road repair project, to lead a team of 5 workers. You are expected to finish all repair work within 15 days, and have been asked by your project manager what you will do to complete the project within the stipulated time. Discuss the measures required to achieve your manager's deadline, in terms of: your definition of quality in this project and what should be included in the quality management plan here; the procedures required for this project development process: what is to be included in your scope-of-works document, your leadership role as it relates to the company's quality policy towards the successful completion of the…
- 9:38 O A O 4 .l 414 4woa9idón4Eqd0c32r5kmr.J. A university is considering two alternative types of bleachers for a new gymnasium. One of the two alternatives will be chosen. Assume that the benefits of the gymnasium are the same for both construction methods. Alternative A: Wooden bleachers on earth fill The first cost of $110.000 for the earth fill and $100.000 for the wooden bleachers. The annual painting costs are $5.000. The wooden bleachers must be replaced every 30 years at a cost of $100,000. The earth fill will last the entire 120 years Alternative B: Concrete Bleachers The first cost is $350,000. The expected life of the concrete bleachers is 120 years and the annual upkeep costs are $2.500 The university Uses a MARR of 7%. Which of the two alternatives is better? Opening in Google Drive.Project management involves the following except.. Oa thoughtlessness Db.monitoring Oc. planning Od. delegating A Moving to another question wil save this response. AR P9For 300 trips, assign them using constant assigntment ratio Route Hours 1 1.1 2 1.2 3 1.3 4 1.4 5 1.5