Meals are cooked in a process with two resources, The first cesource has a capacity of 9.5 meals per hour. The capacity of the second resource is 10 meals per hour. Demand for this process is 72 meals per hour. Instruction: Round your answer to three decimal piaces. What is the cycle time of this process (in minutes)? minutes
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 11.5…
A: Given, Waiting time before the start of the batch = 2 hours Setup time = 2 hours Waiting time for…
Q: Travelers are the flow unit in a process with two resources. The capacities of the resources are 1.3…
A: Utilization is nothing but the process of making efficient or practical use of anything. Utilization…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 12.75…
A: Find the given details below: Given details: Flow time 12.75 hours Waiting time before…
Q: What is the maximum utilization a resource can achieve?a. A value equal to the demandb. A value…
A: d. 1.00
Q: Quick Stop Pharmacy is a small family-owned drug com-pounding business in Portland Oregon that is…
A: In the above question the for ascertaining the number of patients to be dealt with in one hour, we…
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: The concept used here is cycle times and bottleneck resource identification.
Q: Cubway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes…
A: Here, First, I would draw the flow chart for this application case or situation, the flow chart is…
Q: A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over…
A: Given- Restaurant Max capacity = 60 customers Output (Customer Serving) = 70 customers
Q: In a company that processes insurance claims, the aver- age flow rate is 10 claims per hour and the…
A: Average number of claims=Average flow rate×Average throughput time=10×6=60 claims Hence, the average…
Q: Suppose Dunkin Donuts prepares its Munchkins before opening each day. Each batch consists of 500…
A: Given, Batch size = 500 Setup time = 15 minutes Processing time = 1 minute
Q: In a company that processes insurance claims, the average flow rate is 10 claims per-hour and the…
A: Average claims in the system = T*R = 6*10 = 60 claims on average On the basis of…
Q: Diners are served in a process with two resources. The first resource has a capacity of 0.9 diners…
A: The total labor content is defined as the time sum of all process steps. First Resource Capacity =…
Q: Clients are served in a process with two resources. The first resource has a capacity of 14 clients…
A: Given data: Capacity for the first resource = 14 client/hour Capacity for the second resource = 15…
Q: What is the effect of waiting time on a manufacturing process? Why is it good to reduce waiting…
A: Waiting time essentially affects producing measure. The longer the cycle is in pausing, the higher…
Q: a) Balance this operation using the shortest operation time rule and compute the efficiency of the…
A: Activity Immediate Predecessors Duration K3 - 60 K4 K3 24 K9 K3 27…
Q: It is election day and 1800 voters vote in their precinct’s library during the 10 hours thepolls are…
A: Inventory or stock is the products and materials that a business holds for a definitive objective of…
Q: Fritz makes custom chocolate portraits of dogs and sells them online. He is trying to figure out how…
A: The total revenue earned from selling a good or service equals its price multiplied by its quantity…
Q: Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken,…
A: Following formula can be used to calculate implied utilization rate: Firstly, the workload needs to…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 16.65…
A: Given, Flow time in minutes = 16.65 hours * 60 minutes = 999 minutes Value added time = 1 minute +…
Q: Students are going through a three-step process to obtain their ID cards. Each student will first…
A: To be calculated: Time is taken to process 10 students Given values: A 3-step process Process 1 -…
Q: Given the following information, compute the takt time: Total time per shift is 480 minutes per day,…
A: Takt Time = Net time available per day/ Daily demand Daily demand = 80
Q: Cans are made in a process with two resources. The first resource has a capacity of 11 cans per…
A: Given: 1st resource capacity =11 cans/sec2nd resource capacity =10 cans/sec 1st resource has workers…
Q: A process consists of 3 resources. Assume there exists unlimited demand for product, Resource 1 has…
A: Given- Processing time of Resource 1 = 6 minutes per unitProcessing time of Resource 2 = 4 minutes…
Q: a process consisting of three resources. Assume there exists unlimited demand for the product, and…
A: since we only answer up to 3 subparts, we'll answer the first 3. please resubmit the question and…
Q: Mack’s guitar fabrication shop produces low cost, highly durable guitars for beginners. Typically,…
A: Multifactor productivity (MFP), otherwise called complete factor productivity (TFP), is a proportion…
Q: Recall "Tommy's Dresses to go" case. Three years after, this company still rents designer dresses to…
A: Tenants request residences for periods ranging from one month to a year, and in some cases even…
Q: A process has 2 steps: Step A and Step B. The stage capacities of the two steps are listed in the…
A: Here the process has 2 steps, step A and step B, for each step, we have the stage capacity, to…
Q: Loans are evaluated in a process with two resources. The first resource has a capacity of 30 loans…
A: Given, First resource capacity = 30 loans / hour Second resource capacity = 38 loans / hour Demand =…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 0.38…
A: GIven Information: Capacity for the first resource: 0.38 applications per minute Capacity for the…
Q: The Stylish Hair Salon has three stylists who provideservices to women. After checking in with the…
A: Given Check-in time - 1 minute Customer’s washing, drying, and styling - 25 minutes Payment - 3…
Q: In a company that processes insurance claims, the average flow rate is 10 claims per hour and the…
A: a) Average claims in the system = T * R = 6 *…
Q: Loans are evaluated in a process with two sequential resources. The capacities of the resources are…
A: Given, Loans are utilized in a process with two sequential resources with, Capacity C1 =0.16 loans…
Q: 30,000-seat college football stadium is used 18 times for games, concerts, and graduation…
A: It is given that the stadium has been used 18 times. So, the Resource used = 18 times
Q: . In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 11.5…
A: Answer: Bike frame has a flow time about 11.5 hours. According to the data provided in the problem ,…
Q: Round "Utilization" to a whole percent, and "Cycle Time" to 1 decimal. What is the capacity of the…
A: Here, we have the following data, each nurse would take 1.25 hours to complete the visit of one…
Q: Does increasing the capacity of a resource ever increase the arrival rate to the resource group that…
A: Increasing the ability of resources often improves the flow of the operation. By increasing power,…
Q: Suppose for a particular process that the bottleneck cycle time is 54 seconds, and raw processing…
A: We have joined after 4 customers, hence there are a total of 5 customers in the system now
Q: There are three sequential operations (Station 1, Satiation 2, and Station 3) in a process. Incoming…
A: Theoretical flow time indicating the time required to complete a single task. Here, we can calculate…
Q: A work system has five stages with processing times of of 6, 4, 2, 8, and 10 mins/unit. A product…
A: Given- A work system has five stages - Processing times for stages are 6, 4, 2, 8, and 10 mins/unit
Q: When a patient enters the Valley Health Clinical Laboratory to have his blood drawn and a Chemistry…
A: Given information:Number of techs (N) = 3Operating time per day (H) = 8 hours…
Q: e Stylish Hair Salon has three stylists that provide services to women. After checking in with…
A: Bottleneck is the congestion point in a production process that occurs when the workloads arrive…
Q: The Stylish Hair Salon has three stylists who provide services to women. After checking in with the…
A: We have, Processing time per customer for receptionist = 1 +3 = 4 minutes per customer Processing…
Q: What is the bottleneck cycle time of this process (seconds/customer)? What is the raw processing…
A: Given data is Station 1 cycle time = 38 seconds Station 2 cycle time = 44 seconds Station 3 cycle…
Q: In the welding operations of a bicycle manufacturer, a bike frame has a flow time of about 14.35…
A:
Q: For a particular process, suppose the bottleneck cycle time is 40, and the raw processing time is…
A: The Process Cycle Efficiency, in some cases alluded to as the Value Added Ratio, is an estimation of…
Q: her line can produce a unit in 10 minutes. The bottleneck is station (just fill in a number in this…
A:
Q: Apples are prepared in a process with two resources. The first resource has a capacity of 2.1 apples…
A: Process cycle time indicating the average time required to complete a unit of item. Here, we can…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 21…
A: Given: Process Demand = 16 application/hourThe capacity of 1st resource = 21 Applications/hour The…
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- C&A Furniture uses a four-step process to make its famous wood table: Processing Time Process Milling Table top Milling Table stand Assembly Finishing The milling machine requires a setup time of 30 minutes to make table tops and a changeover time of 30 minutes to make table stands. If the batch size is 10, what is the capacity of the process in tables per minute? A) 0.077 B) 0.05 C) 0.067 10 5 15 20 D) 0.048Recall "Tommy's Dresses to go" case. Three years after, this company still rents designer dresses to customers, but it has managed to streamline its internal processes and expand to different segments of demand. Now, customers can rent clothes for anywhere between 1 days to 30 days, and each customer is sent only one (1) dress (instead of 2 dresses described in the case). The company alsó takes only 13 number of days to turn around a dress (i.e., this the duration starting with return from a customer, to again being rented out to a customer). The current demand is an average of 1,000 customers per day, and the company owns total of 30 thousand dresses. What is the average rental duration? (i.e., what is the average number of days, a customer keeps a dress).A plant offers 2 scheduled breaks, 15 min each during shifn hours. It uses PFD allowance factor of 8%. The normal time to produce one unit 1.00 min. Then standard output during shift hours is
- A copy center in an office building prepares bound reports for two clients. The center makes multiple copies (thelot size) of each report. The processing time to run, collate, and bind each copy depends on, among other fac-tors, the number of pages. The center operates 250 days per year, with one 8-hour shift. Management believesthat a capacity cushion of 15 percent (beyond the allowance built into time standards) is best. It currently hasthree copy machines. Based on the following table of information, determine how many machines are neededat the copy center Item Client X Client YAnnual demand forecast (copies) 2,000 6,000Standard processing time (hour/copy) 0.5 0.7Average lot size (copies per report) 20 30Standard setup time (hours) 0.25 0.40Tuff-Rider, Inc., manufactures touring bikes and mountainbikes in a variety of frame sizes, colors, and component com-binations. Identical bicycles are produced in lots of 100. Theprojected demand, lot size, and time standards are shown inthe following table: Item Touring MountainDemand forecast 5,000 units/year 10,000 units/yearLot size 100 units 100 unitsStandard processing time .25 hour/unit .50 hour/unitStandard setup time 2 hours/lot 3 hours/lot The shop currently works 8 hours a day, 5 days a week,50 weeks a year. It operates five workstations, each producingone bicycle in the time shown in the table. The shop main-tains a 15 percent capacity cushion. How many workstationswill be required next year to meet expected demand withoutusing overtime and without decreasing the firm’s currentcapacity cushion?It takes a lawyer 120 minutes to serve one customer. Demand is 2 customers per eighthour day. The lawyer has a wage rate of $200 per hour. What is the cost of direct labor for the lawyer expressed in $ per customer?
- CarCity is a big retailer for car parts and accessories. The store stocks different types and sizes of car tire. One of the best selling tires is the Tiger Model R125, which is currently purchased from a factory in Indonesia. An analysis of the purchasing operation shows that approximately 3 labor hours are required to process a purchase order, regardless of the quantity purchased. Salaries in the purchasing Department average OMR 12 per hour, including employee benefits. In addition, a detailed analysis of 15 previous purchase orders showed that OMR 132 was spent on telephone, paper, and other consumables directly related to the ordering process . Shipping cost from Indonesia is OMR 230 for a container. A container has a capacity of 800 tires. The lead time for shipments from Indonesia is 15 days. Finally, CarCity’s financial analysts established a holding cost of 20% for this type of tire. The annual demand for the R125 tire is constant at a rate of 8400 units. The store purchases…CarCity is a big retailer for car parts and accessories. The store stocks different types and sizes of car tire. One of the best selling tires is the Tiger Model R125, which is currently purchased from a factory in Indonesia. An analysis of the purchasing operation shows that approximately 2 labor hours are required to process a purchase order, regardless of the quantity purchased. Salaries in the purchasing Department average OMR 15 per hour, including employee benefits. In addition, a detailed analysis of 20 previous purchase orders showed that OMR 132 was spent on telephone, paper, and other consumables directly related to the ordering process (see guidelines above to obtain value of 132). Shipping cost from Indonesia is OMR 250 for a container. A container has a capacity of 800 tires. The lead time for shipments from Indonesia is 15 days. Finally, CarCity’s financial analysts established a holding cost of 30% for this type of tire. The annual demand for the R125 tire is constant at…CarCity is a big retailer for car parts and accessories. The store stocks different types and sizes of car tire. One of the best selling tires is the Tiger Model R125, which is currently purchased from a factory in Indonesia. An analysis of the purchasing operation shows that approximately 2 labor hours are required to process a purchase order, regardless of the quantity purchased. Salaries in the purchasing Department average OMR 15 per hour, including employee benefits. In addition, a detailed analysis of 20 previous purchase orders showed that OMR 132 was spent on telephone, paper, and other consumables directly related to the ordering process (see guidelines above to obtain value of 132). Shipping cost from Indonesia is OMR 250 for a container. A container has a capacity of 800 tires. The lead time for shipments from Indonesia is 15 days. Finally, CarCity’s financial analysts established a holding cost of 30% for this type of tire. The annual demand for the R125 tire is constant at…
- Josie’s Sports Accessories has 12 operators who work 9 hours a day (no breaks), 7 days a week. They manufacture headbands with a standard minute value of 1.35 minutes. The workers produce 4,450 headband a day. How long will it take them to complete an order for 5,000 headbands?JB Bunt's fleet repair facility has the capacity to repair 800 trucks per month. However, due to scheduled maintenance of their equipment, management feels that they can repair no more than 600 trucks per month. Last month, two of the employees were absent several days each, and only 400 trucks were repaired. What is the utilization of the repair shop?Guesstimate how much work-in-process inventory they would expect to see in a production line that produces ambulances.