WTP Infitration Runot
Q: Create PERT diagram using below details, Event Description Expected Time (in weeks) Preceding Event…
A: Introduction- The PERT approach (Program Evaluation & Review Technique). A PERT chart is one of…
Q: What are the Contents of the Construction Dairy?
A: The record of a construction project where the progress of worksite is made is termed as…
Q: H.w @ Construct the PERT Net work for the data Shown below and determine the expected finish date ,f…
A: Given data,
Q: ain the building properties/configurations whic
A: Building Configuration Shape and environmental factors of any structure plays a very import job in…
Q: What are the disadvantages of baghouses?
A: Baghouse is a filter used in the air pollution control device and dust collector. It is also known…
Q: swer asap. Thank y
A: i angle of twist criteriaWE KNOW FOR SERIES ϕAC=ϕAB+ϕBCϕAC=TLABGJAB+TLBCGJBC1.25°×π180°…
Q: s óf tên jöbs. The predecessor relationship below: Job Identification (4, 5) (4, 7). (5, 8) (6, 8)…
A:
Q: Q=15, thanks.
A:
Q: of nsions? O Option 1
A: Option 1,2, 3 does not completely give the dimensions of their respective figures.
Q: How is the float useful for the contractor?
A: - Float denotes the range within which the activity time or the finish time may vary without…
Q: What information is not included in the front end specifications. Defective Work Contract Time…
A: Front end specifications are nothing but the information which includes various aspects of the…
Q: Dewfine the term final completion?
A: During the closing process of the project, the final completion-also recognized as final approval is…
Q: Construct the PERT Met work for the data Shown below and determine the exPected finish date ,f…
A: First we will calculate the expected time of each activity
Q: Which clause refer to notification of change of respource or representative or personnel of…
A: As per FIDIC Red Book Contractor's Representative is any person named by the contractor in the…
Q: nstable. For ns, show your work for both the equation method and the "by inspection metho nowing…
A:
Q: Explain the contractural relationship between the client with design and construction team with the…
A: The contractual relationship between the client with design and construction team is shown below:…
Q: LEASE SHOW COMPLETE FBD AND COMPLETE SOLUTIO
A: MAKE FBD OR EQULIBRIUM LETS MAKE NO ACCERLERATION
Q: Construct the PERT Net work for the data Shown below and determine the finish date,f ProbabilIty of…
A:
Q: the quoted
A: Given data, For bidding a project of a contractor, Direct cost= Rs 160000 Indirect cost=Rs 20000 If…
Q: Question 5: A crawler bulldozer aving the information shown below; the contractor intends to rent…
A:
Q: a) write down the name of the structure used to withdvaw water Prom a surface of wales to the wates…
A: Note:- Hi! Thank you for the question As per the honor code, We’ll answer the first question since…
Q: 700 kPa 4 MPa 40 MPa 600 kPa (a) (b) (c)
A:
Q: It is required to calculate the quantity and cost of reinforced concrete for the attached scheme.…
A: Solution: Given: Since the given picture is not clear, so the dimension of the wall is assumed as;…
Q: omplete s
A:
Q: Spiffy Dry Cleaners has recently changed management,and the new owners want to revise the current…
A: Non adjacent loads From 1 = 0 From 2 = 45+75= 120 From 3= 20+235= 255 From 4 = 30+10+50= 90 From 5 =…
Q: Which clause refer to notification of change of respource or representative of contractor under the…
A: General conditions of contract (GCC)- Contract is a legal agreement between two parties. There are…
Q: A crawler dozer with (3.2 x 1 y) blade will be used in dozing operation. The martial is a dry Gravel…
A: Given, V = 3.2 cy O&O cost = 65$/hr Wages = 15$/hr
Q: QI/B/A building was implemented in dimensions (35 x 30) m, it contained a bascment, ground, Ist, 2nd…
A: (1) Given three floors, basement, and ceiling have same costs. It is required to determine the…
Q: An air-conditioning contractor is installing a heat pump system in a privatehome. He has agreed to…
A: Given: Heat pump costs=$1,495 Electrical supplies=$53 Ducting= $81 Other supplies= $39 No of labour…
Q: Question 27 ot yet anwed Pints ut of00Prgnton A contractor has purchased a wheel loader for $115,000…
A:
Q: 2 sin a cos?a tan a = sec a+cos a+sin²a sec a
A: To prove:-
Q: Describe about Micropiles—installation and applications.
A: The drilled deep foundation of 5-12 inches in diameter and can go to a depth of 200 feet to achieve…
Q: ne first requirement of thé updating anid dndly2ing O carefully perform the proper inspections O…
A: Critical path is the longest path and shortest duration permissible. Hence, identification of…
Q: 3. You are working on an estimate fo of the garage is 35,000sf. It is 3
A:
Q: prepare a list of material and estimate the cost for providing a 1 bhk flat with 1 rest room
A: A rough estimate for house construction, using Thumb Rule: Cement will cost around 16.4% of total…
Q: calculate the total headloss
A:
Q: Two technicians from the All Cool Company worked on a repair job. Janetearns $13.25 an hour and…
A: Given values: Janet: Money earned per hour = $13.25 No: of hours worked = 10.5 hours Bill: Money…
Q: Q3: A company awarded a contract to erect 124 electrical towers the table below shows the sequential…
A:
Q: . sec? @ tan? Ө d®.
A:
Q: need it asap plss
A:
Q: "The cost for a standard size concrete block (400 x 200 x 200) is $ 5.56 (including material &…
A: Q1. Given, Length of concrete block, L = 400 mm = 0.4 m Width of concrete block, W = 200 mm = 0.2 m…
Q: How MaNy JNKNOWNS RESTRONTS MF THERE
A: Number of restraints are different for different support reactions In the given beam there are two…
Q: a) What is the main difference between elastic
A: a.) Elastic deformation Elastic deformation is the deformation that can be recovered fully to its…
Q: If(h=o:Xcm) find muns for figure belas mah) 225 mm loo mm
A: welded connection leads to saving in expenditure on material and labor. it leads to rapid…
Q: A Moving to another question will save this response. estion 5 A soils void ratio can exceed 100% O…
A:
Step by step
Solved in 3 steps with 2 images
- Question 2 5 points The following is relevant water demand information for the town of Goodborough for the design year of 2050: Design Population = 10000 Annual average per capita water demand = 250 L/d Assume a water supply system of Type C is considered for the town, as shown below: Elevated Storage WTP HLP LP Smce Community camouners) Assuming that BOTH equalization storage AND fire storage provided are sufficient, determine the following to meet the water needs of the community in the design year, as per Ontario guidelines A) Design capacity of the WTP (in ML/d; ignore losses) B) Design capacity of Conduit III (in ML/d)Question 4 The following is relevant water demand information for the town of Goodborough for the design year of 2050: Design Population = 10000 Annual average per capita water demand = 250 L/d Assume a water supply system of Type A (NO storage) is considered for the town, determine the following to meet the water needs of the community in the design year, as per Ontario guidelines A) WTP capacity needed to meet needs with NO fire (in ML/d; ignore losses) B) WTP capacity needed to meet needs with fire (in ML/d; ignore losses) C) Design capacity of the WTP (in ML/d; ignore losses)A planned community has a population of 63,000 people and is growing at 8.5% per decade. What is the likely average daily water demand 20 years from now? What are the annual water requirements for the city? What is fire demand? Assume the annual average per capita demand of 425 L/C-d and the . What would be the capacity that should be used for the distribution system? The monthly, weekly, daily and hourly max factors are 1.2, 1.4, 1.8 and 2.7, respectively.
- Problem 1A 300-house residential development is proposed. Assume that each person uses 500 liters on average eachday. Suppose that four people live in each house. Calculate how many more liters of water per day onaverage that will need to be supplied.The water engineer aims at prevention contamination of water supplies at all times. In most small water supply systems, however, economic reasons prevent 24-hour daily water service. This creates a risk of polluted water infiltrating into the pipelines through leaks in pipe joints and service taps. How would the water engineer ensure that the pollution do not pose a health risk to domestic consumption? Give example of factors to consider when selecting the material for the pipe.?A town's household flow rate is measured at 90 gpcd (gallon/capita.day). If the plant receives 34.25 MGD (million gallon per day), but 12% of that is inflow & infiltration, the population of the town is: Select one: O 256,875 People O 334,889 People O 45,667 People O 3,699,000 People
- Civil Engineering A catchment area of 150 miles2 with a planned development of 70%, a stream flow of 0.9 MGD/mile2, and storage for 1/2 year's supply. Consumption is 160 gpcd. How many people will this supply? round to the nearest 5001. Please look up the USEPA National Pollutant Discharge Elimination System (NPDES) and describe how it applies to Municipal Wastewater Systems. Also what is the mechanism through which NPDES can ensure clean water?in simple terms, explain how to use a lagoon and evapotranspiration in wastewater processing and disposal.
- A tank has 40L of sewage runoff. It initially consists of 60% water and 40% pollutants. Another sewage runoff with 70% water and 30% pollutant is being added to the tank at a rate of 3L/min. As the tank is being filled, the solution is also being drained at a rate of 4L/min. How much pollutant is in the tank after 7 mins?(b) Based on what you know about wastewater treatment and drinking water treatment steps, which method would you recommend modifying to reach the needed effluent concentration needed for wastewater to be directly reused?Service Level 1 22 3. Sta. Monica water district is planning to expand their service coverage by providing water to the unserved barangay of Municipality of Sta. Monica. The management has three alternatives using the different service level. If you are the decision maker, what alternative do you approve, explain and defense your choice. Amount are in total for the whole lifespan of the system. Source Capital Operating Expected Revenue* Cost* Exp* Groundwater 10 10 0 Groundwater 30 100 250 Surface 50 200 300 Water Groundwater 80 150 450 Surface 100 200 650 Water 2 2 3 3 in MPhp