14. A production line is to be designed to assemble a product. The assembly of this product requires three tasks, one of which requires 0.3 minutes to complete, one of which requires 1.4 minutes to complete , and one of which requires 0.7 minutes to complete. If this production line has three workstations and a cycle time of 1.5 minutes , what is its efficiency ?
Q: Question 6 a) The Zephyr Television Company ships TVs from three warehouses to three retail stores o...
A: From/To Store A Store B Store C Supply Warehouse 1 16 18 11 300 Warehouse 2 14 12 13 200 Wareh...
Q: develop two conditional statements related to our classroom. then formulate converse and inverse sta...
A: Conditional statements are statements that are made based on a set of circumstances. To begin, descr...
Q: What are the fundamental building blocks of manufacturing?
A: These innovations included new steel-making processes, large-scale manufacturing, sequential constru...
Q: A part structure, lead time (weeks), and on-handquantities for product A are shown in Figure 14. 14....
A: given,
Q: Company PT. Indah Garment has a QC division: Quality Control on duty Ensure that the raw materials ...
A: A Small Introduction about Quality Control Quality control includes testing units and deciding whet...
Q: You are product planner for product A (in Problem(A part structure, lead time (weeks), and on-handqu...
A: An intended bill of material can be developed as follows:
Q: Understanding and predicting inventory obsolescence is an important determination for retal companie...
A: Inventory management is described as the process through which orders are placed, products are sold,...
Q: Consider the example of the machine shop with the from-to charts given in Figures 11–3 through 11–5....
A: A Small Introduction about Manufacturing Manufacturing is the most common way of transforming unref...
Q: ctual demand was 210 lakhs of saops , now using the smoothing constant choosen by the management of ...
A:
Q: ter at a large regional hospital provides training sessions in CPR to all employees. Assume that the...
A: Following will be the definitions : Efficiency = (Actual output ÷ Effective capacity) × 100 Utilizat...
Q: With respect to Microsoft’s acquisitions, Skype and Nuance, discuss the strategic benefits expected ...
A: Product development is the finished course of conveying another product or working on a current one ...
Q: ow much would the minimum total annual inventory-related costs that JJ would incur if it applies the...
A: EOQ stands for Economic order quantity, and at EOQ level the cost of inventory remains lowest, sugge...
Q: A delivered price (including attachments) of a crawler dozer tractor is $135,000 with a residual val...
A: Depreciation is an accounting method for allocating the cost of a substantial or physical asset over...
Q: Table Q4 shows information for systems A and B. By using the information provided determine: Table Q...
A: Note: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-p...
Q: A wrapping box company manufactures 4500 rolls of the wrapped box in a week. The SP is €23 and the c...
A: Productivity is the ability to produce finished goods and services effectively and efficiently in a ...
Q: What functions of the firm affect an MRP system? How?
A: MRP system is the tool used in the production process that helps to compare the inventory level and ...
Q: Brenda Last, an undergraduate business major at State University, is attempting to determine her cou...
A: Binary integer linear programming refers to the linear programming technique in which the objective ...
Q: b. Determine the expected value of perfect information using an opportunity loss table. (Round your ...
A: Here, we could see the Cost matrix, we have a probability for each state of nature, and we have thre...
Q: calculate the productivity of the firm that produces beef products as it produces 6000 units in almo...
A:
Q: Passenger miles flown on Northeast Airlines, a commuter firm serving the Boston hub, are shown for t...
A:
Q: 2. a. Develop a linear trend line for the following data. (Solve manually, using Minitab and using E...
A: Note: “Since you have posted a question with multiple sub-parts, we will solve the first three sub-p...
Q: 100% Inspection means every part is inspected in other words all parts or characteristics of a parti...
A: Definitions: Sampling: - Sampling is a process of checking each item or product from the lot or batc...
Q: Passenger miles flown on Northeast Airlines, a commuter firm serving the Boston hub, are shown for t...
A:
Q: Cutey Barber Salon Cutey Barber Salon is a trendy barber salon that is located in a densely populate...
A:
Q: There is no doubt that the Chinese government engages in restriction, remains authoritarian, and is ...
A: It is given that runaway is a manufacturer of shoes and sportswear and is considered socially respon...
Q: Maribel is considering installing ice cream stalls on Turtle Beach. The length of the beach is 5 mil...
A: Demand(D) = 1000 Fixed cost= holding cost (H) = $40 Transportation cost=Ordering cost(O)=$2.5
Q: Cutey Barber Salon is a trendy barber salon that is located in a densely populated city called Maple...
A: Given information - Year Demand for haircuts and hairstyling2017 11,5002018 12,...
Q: How does MRP II differ from MRP?
A: A Material Requirements Planning often called MRP framework can be stated as the planning and decisi...
Q: a) Assuming that Ritz must have the semiconductor (stopping or doing without is not a viable option)...
A: A Small Introduction about Production Production is the method involved with consolidating differ...
Q: The YT ltd. the output produced is of €47,67,000 and the input costs are material is € 1,20,000, ene...
A: Given: Output = € 47,67,000 material input = € 1,20,000 energy input = € 3,56,000 miscellaneous inpu...
Q: Bluehilton furniture produces 54 tables a day, labour costs to around 745 Rupees ,energy cost is 499...
A: Given: No. of tables quantity = 54 units Labour cost = Rs. 745 Energy Cost = Rs. 499 material cost =...
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For on...
A: In this question, I would determine the needed capacity requirement in terms of customers per day, h...
Q: A supervisory personnel in an organization should bear the full responsibility for the proper implem...
A: The supervisor, being the manager in direct connection with the operatives, has got various function...
Q: Using the information in Problem(The demand for subassembly Sis 100 units in week 7.Each unit ofS re...
A: Manufacturing activities management requires various offices to cooperate to deliver quality items a...
Q: A manager wants to assign tasks to workstations as efficiently as possible and achieve an hourly out...
A: Given- Production time in minutes = 60 minutes Demand units = 30 units
Q: Describe MRP II
A: MRP and MRP II are considered as the predecessors to the Enterprise Resource Planning often called E...
Q: (in thousands) ɔ) The MAD for this model = 2.38 (round your response to two decimal places). c) Comp...
A: Given data - Week Actual Forecast 1 17 17.00 2 21 17.00 3 19 17.80 4 23 18.04 5 18 19....
Q: Demand 7 9 5 11 10 13 The least squares regression equation that shows the best relationship between...
A: To get the relationship between demand and period, here, first, I would determine the intercept and ...
Q: Angelina and Sophia attended a professional development retreat at Ferncliff Camp. They met at a dow...
A: Two girls Angelina and Sophia attended skillful or competent development retreats at the camp. After...
Q: Think about planning an event. What resources do you need to pull it off? How are you going to plan ...
A: The event I am taking is a birthday party.
Q: what are the fundamental and what are the fundamental and integtrated approaches to cost estimation ...
A: Cost estimation in the context of project management can be stated as the approach of predicting or ...
Q: Explain the model of ethical decision-making in business and explain how it differs from the process...
A: An ethical decision-making model is a framework that executives can use to introduce these ideas to ...
Q: Identify five specific requirements of an effective MRP system.
A:
Q: Assume that it is not known at this time who will be assigned to work on this task, calculate the ef...
A: Here, I could determine the estimated effort needed for the task using PERT distribution and Triangu...
Q: The monthly sales for Yazici Batteries, Inc., were as follows: Month Jan Feb Mar Apr May Jun Jul Aug...
A:
Q: In Yankee ltd . The total no of units produced are 4555 and for that 356 labour hours are used . Cal...
A: Given : Total no. of units produced = 4555 Total labour hours used = 356 Hours To be determined: s...
Q: What are the challenges of Filinnials? How do you respond these challenges?
A: Businesses and major corporations prefer to invest in international markets and extend their operati...
Q: What barriers muat be overcome for a potential mew product entry?
A: When a new product is ready and launched in the market it does not gain success or popularity direct...
Q: (Must be in essay form, minimum 1000 words) Ali ordered a bowl of soup from AB Restaurant. As he wa...
A: The control of a device's or company's full manufacturing flow is known as supply chain management —...
Q: Q1 No HandWriting: What are Project Management Knowledge areas? Explain the various types of knowle...
A: The techniques & knowledge related to project management are not only for project managers. Comp...
14. A production line is to be designed to assemble a product. The assembly of this product requires three tasks, one of which requires 0.3 minutes to complete, one of which requires 1.4 minutes to complete , and one of which requires 0.7 minutes to complete. If this production line has three workstations and a cycle time of 1.5 minutes , what is its efficiency ?
Given data is
Task time of first task = 0.3 mins
Task time of second task = 1.4 mins
Task time of third task = 0.7 mins
Number of workstations = 3
Cycle time = 1.5 mins
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- An assembly line is to be designed to operate 13 hours per day and supply a steady demand of 325 units per day. Here are the tasks and their performance times: TASK PRECEDINGTASKS PERFORMANCE TIME (SECONDS) TASK PRECEDINGTASKS PERFORMANCETIME (SECONDS) a — 48 g d 43 b — 58 h e 38 c — 73 i f 23 d a 63 j g 33 e b 88 k h, i 53 f c 23 l j, k 67 A) What is the efficiency of your line balance? B) Suppose demand increases by 10 percent. How would you react to this? Assume that you can operate only 13 hours per day in regular time. (Round your answers to the nearest whole number.)An assembly line has 10 serial stations with process times of 1, 2, 3, 4,..., 10 respectively. The process time of the system is: a) 550% of its process cycle time. b) 18.18% of its process cycle time. c) 50% of its process cycle time. d) 100% of its process cycle time.Esplanade Marine Parts Inc. wants to produce parts in batches of 60 parts. Each part must be processed sequentially from workstation A to B. Processing Workstation Batch Size (Q) Time per Part 40 seconds A B 60 60 15 seconds a. How many seconds are required to produce the batch under the assumptions of batch processing? Round your answer to the nearest whole number. seconds b. How many seconds are required to produce the batch under the assumptions of single-piece flow processing? Round your answer to the nearest whole number. seconds C. Compare the two solutions in terms of time saved. Round your answer to the nearest whole number. Using the assumptions of -Select- processing saves seconds.
- An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the totaltime for all tasks is 18 minutes. The line will operate for 450 minutes per day.a. What are the minimum and maximum cycle times?Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly line balancing. She has been told that the firm needs to complete 96 instruments per 24-hour day. The assembly-line tasks for the production of the instrument are: Task Time (minutes) Predecessors A 3 ---- B 6 ---- C 7 A D 5 A, B E 2 B F 4 C G 5 F H 7 D, E I 1 H J 6 E K 4 G, I, J Draw the precedence diagram If the daily production (24-hour) production rate is 96 units, what is the highest allowable cycle time? If the cycle time after allowances is given as 12 minutes, what is the daily (24-hour) production rate? With a 12-minute cycle time, what is the theoretical minimum number of stations with which the line can be balanced? Assign task to workstations. Use the following decision rules (heuristics): longest task first, break ties by assigning the task with the most followers. What are the efficiency and the balance delay of the assembly line? Show detil of…The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new product, Mint Chocolate Chip. The company plans to use this new production line eight hours a day in order to meet projected demand of 1,440 cases per day. The following table describes the tasks involved in the production of a case of Mint Chocolate Chip Cookies. 27 seconds 0.3333 seconds 18 seconds 14 seconds 56 seconds 20 seconds
- You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure. The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes. What is the resulting line's efficiency?A production line contains two stations in series. A total of 10000 good parts are to be manufactured during 300 working days in a year and 8 hours per day (60 min peer hour). The following information are given. For station 1: Scrap rate is 5%, standard time per part is 20 minuts, Efficiency is 85% and machine reliability is 90%. For station 2: Scrap rate is 4%, standard time per part is 30 minuts, Efficiency is 80% and machine reliability is 95%. How many machines would be required at each station? (Round up all your answers) Note: For any station k, lk=0k/(1-Pk) F-Machine Fractions; S=Standard time/part; E=Machine efficiency; R=Machine availability (reliability); and F=SQ/(EHR) where I-input; O=output; Q= Parts input to the station and processed; H-Total Time available in minutes. Station 1: 1 machine; Station 2: 2 machines Station 1: 2 machines; Station 2: 3 machines Station 1: 3 machines; Station 2: 4 machines Station 1: 4 machines; Station 2: 5 machines Station 1: 3 machines;…1. A mobile phone assembly plant has the following process, currently using 4 staff - one on each process step- and 1 test machine. The first step, phone body assembly, takes 9 seconds per phone. The next operator carries out a manual test of the screen and controls at a rate of 200 phones per hour. The next step is an electronic test which is done on a batch of 24 phones at a time by one operator running the test machine. Each batch takes 3 minutes to test including loading and unloading the machine. In the final step an operator packs the phone, charger and user manual in a labelled box, which takes 15 seconds. (a) Calculate the current cycle time and balancing loss for the process with one operator per process step. (b) What is the minimum throughput time of the process in (a) above for a. a single phone b. an order for a batch of 96 phones? (c) If the demand were for 750 phones to be assembled per hour, how many staff and test machines would you need for the process to meet the…
- You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly line balancing procedure. The cycle time is 5 minutes, and the sum of all the tasks required ok the line is 25 minutes. What is the value of the resulting line’s efficiency?3 = noito This work cell will produce 617 units per day (8h x 60 m x 60 se) / 46.67 = 617 Takt time = 140/3 = 46.67 Copyright © 2017 Pearson Education, Ltd. Takt time design Creating plate printing cutting packaging Example: 100 Al-Nojoom Company for advertising has identified the following operations as necessary for the work cell for producing color posters. The customer expects delivery 1000 poster per day, and the work day 10 hours. 1. What is the takt time? Copyright © 2017 Pearson Education, Ltd. 2. How many employees are required? 3. If the number of employees assumed to be 9 employees. Find the quantity of products they able to produce. 4. If the work cell has 4 employees find the Total work time by hours needed to produce 600 units with the same operational time. operation Standard time 21.01 unitnos (min) 1.1 0.9 .75 1.25 1 9-33 sill nG a super 9-34Consider the following two production processes making an electronic component for a navigation system. Both processes consist of 20 stations and operate at a cycletime of 1 minute/unit. Their most error-prone operation is step 9:• Process 1 has a final inspection at the end of the process and has about 300 units of inventory between step 9 and the inspection.• Process 2 has each worker check the work of the previous steps and about 50 units ofinventory between step 9 and the end of the process, roughly equally distributed across theremainder of the process.What would be the information turnaround time for a defect made at station 9?