(a) A fruit grower has 150 acres of land available to raise two crops, A and B. It takes one day to trim an acre of crop A and two days to trim an acre of crop B, and there are 240 days per year available for trimming. It takes 0.3 day to pick an acre of crop A and 0.1 day to pick an acre of crop B, and there are 30 days per year available for picking. Find the number of acres of each fruit that should be planted to maximize profit, assuming that the profit is Php 140 per acre for crop A and Php 235 per acre for crop B.
Q: Identify some reasons for ERP failures?
A: Since you have posted multiple questions, we will provide the solution only to the first question as…
Q: What is x? (Do not roun X
A: A network diagram shows the sequence of the task that is done to complete a project. It usually…
Q: What do we mean by forecast? b. Can a forecast have an error? Justify your answer.
A: Here, I would discuss the meaning of forecast and I would also explain whether a forecast could have…
Q: Summarize how you would allocate people and money to each work breakdown structure activity (WBS).
A: Project management is planning and organizing the resources that are used to complete the required…
Q: A residential moving company needs to move a family from city 1 to city 12 in the figure below where…
A: (a) optimal path is shown in pink. 1-3-6-8-10-11-12
Q: How did emergence of the internet affect the field of logistics
A: As per this Q, I would describe how the emergence of the internet affects the field of logistics,…
Q: How crucial is it to include management-employee conflicts in your company's business plan's…
A: Your business's objectives, goals, processes, and timetable are all explained in great depth in the…
Q: Following predetermined security measures is of paramount significance. The importance of security…
A: Security measures are critical for safeguarding individuals, organizations, and even nations from…
Q: So, what exactly constitutes a well-known online destination? If a company is too tiny to afford it,…
A: A website with a significant number of visitors and a solid reputation as a trustworthy and…
Q: Which errors manifest most often during performance testing?
A: During performance testing, the following errors are common: Load balancing issues: When there is an…
Q: An expensive piece of equipment is used in the masking operation for semi-conductor manufacture. A…
A: To find: The optimal time to replacing the capacitor. Given: The replacement cost is C1=$150. The…
Q: Clinic administrator Dana Schniederjans wants you to forecast patient numbers at the clinic for week…
A: Forecasting is one of the techniques to know some future figures on the basis of past data. This…
Q: Unproven strategies are pointless. List the many methods of testing that might be used
A: Only proven tactics might result in resource waste and better decision-making from the standpoint of…
Q: This question deals with the distribution element of a business. Distribution or place/location is…
A: Milwaukee's statement about their business succeeding when their distributors' business succeeds…
Q: Explain how the Spiral Model and the V Model work in managing the completion of projects.
A: Introduction- The spiral model can be defined as a model for risk analysis which implies the overall…
Q: A task force refers to: Oa. None of these statements describes a task force. O b. any formal group…
A: The project manager or a senior leader may assign a taskforce to a project. In a limited amount of…
Q: Functional products differ from innovative products in the following ways (pick all that apply).…
A: Introduction (Product) Product is either a good or a service that is worth being buying by either an…
Q: b. What is the critical path? OA-C-D-E-G A-C-D-F-G A-B-D-F-G O A-B-E-G c. How many weeks will it…
A: A network diagram shows the sequence of the task that is done to complete a project. It usually…
Q: Why have enterprise resource planning (ERP) solutions become so critical to the IT infrastructures…
A: Enterprise Resource Planning (ERP) can be defined as software that enables organizations to use a…
Q: What are firms' cloud migration challenges? Are there benefits and drawbacks?
A: A Cloud migration is the process of moving an organization's IT infrastructure. it is a transfer of…
Q: What industries will experience the most significant changes over the next decade because of rapid…
A: Technological advancements or adjustments to current technology that have the potential to…
Q: Draw an arrow diagram that depicts the logic for finishing work on a house project, as described…
A: Here, for each activity, I have been given the immediate predecessor data, using such activity…
Q: Data collected on the yearly registrations for a Six Sigma seminar at the Quality College are shown…
A: Exponential smoothing determine with following formula Exponential smoothing = Alpha*At+(1-Alpha)*Ft…
Q: Possible results include expanding the project's goals or adding unnecessary features. Explain the…
A: The outcomes of a project are always preplanned and determined and on the basis of the outcomes,…
Q: Given the following data, use exponential smoothing (a=0.20) to develop a demand forecast. Assume…
A: A statistical technique for predicting time series data is exponential smoothing. It is a well-liked…
Q: Your line manager, Ms Lionheart, has collected and scrutinised performance data for the company. She…
A:
Q: Based on the given attendance, the seasonal indices for each of the seasons are (round your…
A: Forecasting is one of the techniques to know some future figures on the basis of past data. This…
Q: The production process shown below consists of five stages. The numbers in parentheses are the times…
A: CONCEPT- A bottleneck is a place of blockage in a production framework that eases back or stops…
Q: What is the process of continuously measuring system results, comparing those results to optimal…
A: Combining many company divisions or firms into a single, more significant entity is known as…
Q: explains two control mechanisms and how they may increase project concept buyers' worth.
A: There are following two control mechanisms which use to enhance project concept buyers' worth.
Q: fy the elements of supply chain. Determine whether the supply chain represents a low cost, rapid…
A: This challenge requires us to choose a firm with an efficient supply chain and explain why it is so…
Q: How did you calculate 32.5?
A: Here, Case 1: D > QSo, the payoff will be-= (Selling Price - Cost Price )×Quantity Sold= (0.85 -…
Q: The demand (in units) for a product in the past 4 months are: 371, 398, 384, 367 What is the value…
A: Naive method predicate that next time period value will be the current period value.
Q: Variable cells Cell $B$6 $C$6 $D$6 Cell $E$2 $E$3 Name Constraints. $E$4 Variable 1 Variable 2…
A: Given sensitivity report-
Q: Alinear programming computer package is needed. Western Family Steakhouse offers a variety of…
A:
Q: Darren Mack owns the "Gas n' Go" convenience store and gas station. After hearing a marketing…
A: Given-
Q: What is the relationship among toxic culture, organizational behavior, and organization…
A: A toxic culture is more important than organizational behavior, and organization effectiveness…
Q: In process mapping, the following indicates an input or output. a.Box b.Oval c.Triangle…
A: In process mapping, the following indicates an input or output. a.Box b.Oval c.Triangle d.Diamond…
Q: Explain the fundamental shift in the focus of quality from the Industrial Revolution through the…
A: The main focus on quality throughout the Industrial Revolution was inspection-based quality control.…
Q: What are your thoughts about which areas of the business should be outsourced, which should remain…
A: Hiring is important for creating a successful corporate operation. The best teams are often found in…
Q: The WBS follows a Parent-Child relationship. What is the parent of the work package? The project…
A: WBS is a Work Breakdown Structure. It represents the Parent-Child relationship.There are following…
Q: Assuming a company lacks the necessary skills to make a project technically feasible, what measures…
A: An assessment of a project's viability is called a feasibility study. Examining the materials and…
Q: Explain what you mean by the term "risk management," and detail the steps involved in finding,…
A: Risk management is the process of identifying, assessing, and mitigating risks that may impact an…
Q: A company has six manufacturing plants and six warehouse located at different places in Luzon. The…
A: Given data is
Q: 1. Please give 2 examples of an Absolute Simulated Price. 2. Please give 2 examples of a Relative…
A: Simulated pricing and contracts can be used in operations management to model, analyse, and assess…
Q: Explain the significant of Citations and the APA 7th Edition Style in academic writing
A: Meaning of Academic Writing. Academic writing implies a style of articulation that scientists use to…
Q: Please can the solution be in table form
A: Short ornamental draperies called valances can be used alone or in conjunction with curtains or…
Q: Given the following staffing requirement for a restaurant, an intern is testing out the optimal…
A: Decision Variables- Suppose-Xi be the no. of wait staff needed for restaurantWhere i = 1,2,3,4,5,6,7…
Q: 1. Develop a WBS with at least two levels for a project (e.g., moving away to college, registering…
A: As the name says work breakdown structure can be defined as the representation that divides the work…
Q: ncorrect Question 7 After you finish speaking at a business law conference, an eager fan asks you…
A: Introduction Business law also termed as mercantile law or commercial law is a set of rules and…
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 1 images
- Assume the demand for a companys drug Wozac during the current year is 50,000, and assume demand will grow at 5% a year. If the company builds a plant that can produce x units of Wozac per year, it will cost 16x. Each unit of Wozac is sold for 3. Each unit of Wozac produced incurs a variable production cost of 0.20. It costs 0.40 per year to operate a unit of capacity. Determine how large a Wozac plant the company should build to maximize its expected profit over the next 10 years.It costs a pharmaceutical company 75,000 to produce a 1000-pound batch of a drug. The average yield from a batch is unknown but the best case is 90% yield (that is, 900 pounds of good drug will be produced), the most likely case is 85% yield, and the worst case is 70% yield. The annual demand for the drug is unknown, with the best case being 20,000 pounds, the most likely case 17,500 pounds, and the worst case 10,000 pounds. The drug sells for 125 per pound and leftover amounts of the drug can be sold for 30 per pound. To maximize annual expected profit, how many batches of the drug should the company produce? You can assume that it will produce the batches only once, before demand for the drug is known.The Tinkan Company produces one-pound cans for the Canadian salmon industry. Each year the salmon spawn during a 24-hour period and must be canned immediately. Tinkan has the following agreement with the salmon industry. The company can deliver as many cans as it chooses. Then the salmon are caught. For each can by which Tinkan falls short of the salmon industrys needs, the company pays the industry a 2 penalty. Cans cost Tinkan 1 to produce and are sold by Tinkan for 2 per can. If any cans are left over, they are returned to Tinkan and the company reimburses the industry 2 for each extra can. These extra cans are put in storage for next year. Each year a can is held in storage, a carrying cost equal to 20% of the cans production cost is incurred. It is well known that the number of salmon harvested during a year is strongly related to the number of salmon harvested the previous year. In fact, using past data, Tinkan estimates that the harvest size in year t, Ht (measured in the number of cans required), is related to the harvest size in the previous year, Ht1, by the equation Ht = Ht1et where et is normally distributed with mean 1.02 and standard deviation 0.10. Tinkan plans to use the following production strategy. For some value of x, it produces enough cans at the beginning of year t to bring its inventory up to x+Ht, where Ht is the predicted harvest size in year t. Then it delivers these cans to the salmon industry. For example, if it uses x = 100,000, the predicted harvest size is 500,000 cans, and 80,000 cans are already in inventory, then Tinkan produces and delivers 520,000 cans. Given that the harvest size for the previous year was 550,000 cans, use simulation to help Tinkan develop a production strategy that maximizes its expected profit over the next 20 years. Assume that the company begins year 1 with an initial inventory of 300,000 cans.
- In this version of dice blackjack, you toss a single die repeatedly and add up the sum of your dice tosses. Your goal is to come as close as possible to a total of 7 without going over. You may stop at any time. If your total is 8 or more, you lose. If your total is 7 or less, the house then tosses the die repeatedly. The house stops as soon as its total is 4 or more. If the house totals 8 or more, you win. Otherwise, the higher total wins. If there is a tie, the house wins. Consider the following strategies: Keep tossing until your total is 3 or more. Keep tossing until your total is 4 or more. Keep tossing until your total is 5 or more. Keep tossing until your total is 6 or more. Keep tossing until your total is 7 or more. For example, suppose you keep tossing until your total is 4 or more. Here are some examples of how the game might go: You toss a 2 and then a 3 and stop for total of 5. The house tosses a 3 and then a 2. You lose because a tie goes to the house. You toss a 3 and then a 6. You lose. You toss a 6 and stop. The house tosses a 3 and then a 2. You win. You toss a 3 and then a 4 for total of 7. The house tosses a 3 and then a 5. You win. Note that only 4 tosses need to be generated for the house, but more tosses might need to be generated for you, depending on your strategy. Develop a simulation and run it for at least 1000 iterations for each of the strategies listed previously. For each strategy, what are the two values so that you are 95% sure that your probability of winning is between these two values? Which of the five strategies appears to be best?. A group of students organizes a bake sale in which they sell hundreds of cookies at $1per piece. They set up a table on campus and wait for students to come and purchasetheir cookies. Consider the following variables in this bake sale operation:1. Size of the cookies2. Weather conditions on campus3. Organization of the table4. Number of cookies sold5. Competition from other fund-raisers coinciding on campus6. Amount of advertising and shouting of the students at the bake sale table7. Number of students on campus that dayWhich of these variables is an output variable?a. 3b. 4c. 5d. None of the aboveAt a small but growing airport, the local airline company is purchasing a new tractor for a tractor-trailer train to bring luggage to and from the airplanes. A new mechanized luggage system will be installed in 3 years, so the tractor will not be needed after that. However, because it will receive heavy use, so that the running and maintenance costs will increase rapidly as the tractor ages, it may still be more economical to replace the tractor after 1 or 2 years. The following table gives the total net discounted cost associated with purchasing a tractor (purchase price minus trade-in allowance, plus running and maintenance costs) at the end of year i and trading it in at the end of year j (where year O is now). i 012 1 $13,000 j 2 $28,000 $17,000 3 $48,000 $33,000 $20,000 The problem is to determine at what times (if any) the tractor should be replaced to minimize the total cost for the tractors over 3 years. (a) Formulate this problem as a minimum cost flow problem by showing the…
- At a small but growing airport, the local airline company is purchasing a new tractor for a tractor-trailer train to bring luggage to and from the airplanes. A new mechanized luggage system will be installed in 3 years, so the tractor will not be needed after that. However, because it will receive heavy use, so that the running and maintenance costs will increase rapidly as the tractor ages, it may still be more economical to replace the tractor after 1 or 2 years. The following table gives the total net discounted cost associated with purchasing a tractor (purchase price minus trade-in allowance, plus running and maintenance costs) at the end of year i and trading it in at the end of year j (where year O is now). i B 012 1 $13,000 j 2 $28,000 $17,000 3 $48,000 $33,000 $20,000 The problem is to determine at what times (if any) the tractor should be replaced to minimize the total cost for the tractors over 3 years. (a) Formulate this problem as a shortest-path problem by drawing a…4) The making of rivet holes in structural steel members can be done by 2 methods. The first method consists of laying out the position of the holes in the members and using a drill press costing P100k. The machinist is paid P60 per hour and he can drill 80 holes per hour. The second method makes use of a multiple-punch machine costing P80k. The punch operator is paid P40 an hour and he can punch out 1 hole for 3 seconds. This method also requires an expense of P1.25 per hole to set the machine. (a) if all other costs are assumed equal, what is the total cost for each machine for 10k holes, assuming the total cost of each machine to be charged to these holes? (b) for how many holes will the costs be equal?For a certain civil engineering system, it is sought to maximize the benefits, which is given by the expression: Z=3x+5y. The decision variables are x (the amount of resource type 1 to be used) and y (the amount of resource type 2 to be used). • The amount of resource type 1 should be at least 3 units. • The amount of resource type 2 should be at least 3 units. The difference between the amount of ● resource type 2 and the amount resource type 1 should not exceed 6. • The total amount of resource types 1 and 2 should not exceed 12 units. a. Identify the obiective function for this problem. b. Identify and write the constraints. c. Provide a sketch graph for the constraint set. d. Clearly show the feasible region. e. Label all extreme points (or vertices) of the feasible region and indicate their coordinates. f. Solve the optimization problem.
- A group of students organizes a bake sale in which they sell hundreds of cookies at$1 per piece. They set up a table on campus and wait for students to come and purchasetheir cookies. Consider the following variables in this bake sale operation:1. Size of the cookies2. Weather conditions on campus3. Organization of the table4. Number of cookies sold5. Competition from other fund-raisers coinciding on campus6. Amount of advertising and shouting of the students at the bake sale table7. Number of students on campus that dayWhich of these variables are input variables?a. 1 and 2b. 1 and 3c. 1, 3, and 5d. 1, 3, and 6Fopic 4- Linear Programming: Appli eBook Problem 9-05 (Algorithmic) Kilgore's Deli is a small delicatessen located near a major university. Kilgore's does a large walk-in carry-out lunch business. The deli offers two luncheon chili specials, Wimpy and Dial 911. At the beginning of the day, Kilgore needs to decide how much of each special to make (he always sells out of whatever he makes). The profit on one serving of Wimpy is $0.46, on one serving of Dial 911, $0.59. Each serving of Wimpy requires 0.26 pound of beef, 0.26 cup of onions, and 6 ounces of Kilgore's special sauce. Each serving of Dial 911 requires 0.26 pound of beef, 0.41 cup of onions, 3 ounces of Kilgore's special sauce, and 6 ounces of hot sauce. Today, Kilgore has 21 pounds of beef, 16 cups of onions, 89 ounces of Kilgore's special sauce, and 61 ounces of hot sauce on hand. a. Develop a linear programming model that will tell Kilgore how many servings of Wimpy and Dial 911 to make in order to maximize his profit today.…Three methods can be used for producing heat sensors for high-temperature furnaces. Method A will have a fixed cost of $140,000 per year and a production cost of $62 per part. Method B will have a fixed cost of $210,000 per year and a production cost of $28 per part. Method C will require the purchase of equipment costing $500,000. It will have a life of five years and a 25% of first cost salvage value. The production cost will be $53 per part. At an interest rate of 10% per year, determine the breakeven annual production rate between the two lowest cost methods.