A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 200 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed. What is the minimum number of workstations needed? a. 4 O b. 5 O c. None of them O d. 6 е. 8
Q: A work center consists of 4 machines working 8 hours a day for a 5-day week. If theutilization is…
A: Given data is Number of machines = 4 Working hours = 8hrs/day Working period = 5days/week…
Q: Based on the narrative given, identify SIX (6) weaknesses from the above payroll processes. For each…
A: Payroll processing refers to a crcuical business function, involving to decide on the net pay that…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A:
Q: The Gardner Theater, a community playhouse, needs to determine the lowest-cost production budget for…
A: Below image gives the cost of production which would be required keeping in mid the time available…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given- Available time per day = 8 hours × 60 minutes = 480…
Q: A business company has the following capacity per month
A: Introduction: The term Market refers to an exchange of goods and services between the buyer and the…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: eanie realizes that she has another project that needs to be completed by Saturday and wonders if…
A: A Small Introduction about Crashing Model The CRASH model has been proposed by Medical Research…
Q: Three departments- milling (M), drilling (D), andsawing (S)- are assigned to three work areas in…
A: Given data is Cost of move = $2 per piece per foot
Q: A heavy construction firm has been awarded contract to build a large concrete dam. It is expected…
A: effective cost = Cost − Salvage Value a) YEAR Remaining useful lifeat beginning of year SYD…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given that: Task Duration (in mins) A 2.73 B 2.01 C 2.13 D 2 E 2.61 F 2.71 G 2.95
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: This problem can be solved using:Cycle time = Available time / Desired output
Q: c) What is the theoretical minimum number of workstations? d) Assign tasks to workstations. e) How…
A: In an assembly line, each task is assigned to a workstation in order to meet the specified…
Q: a machine installation job can be finished by 40 men in 40 days. how long will it take for 50 men to…
A: The details are as under 40 men complete installation in 40 days Time required by 50 men if work…
Q: XYZ Company produces and sells 2 products, Lambda and Gamma, and the production process goes through…
A: a) Plantwide traditional approach: applied rate = Estimated m/o cost/Estimated DLH applied…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: What types of scheduling decisions are management likely to encounter in the following operations?…
A: Scheduling is a process decision that tries to offer the right mix of labor & machines to…
Q: Dolls are fabricated in a process with two resources. The first resource has a capacity of 1.5 dolls…
A: Direct labor is productive labor that is allocated to a specific product, cost center, or work…
Q: Mike’s Auto Body Shop has five cars waiting to be repaired. The shop is quite small, so only one car…
A: Tardiness = Repairing time - Promising time Average tardiness = Total tardinessnumber of cars 1.…
Q: Georgetown Pizza makes favorite pan pizzas every day with three working shifts around the clock. The…
A: Break-Even Point - By measuring the market pricing to its actual amount, the breakeven point…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Cycle time is 15.14 minutes
Q: An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the totaltime…
A: Minimum cycle time = length of the longest task Therefore, the minimum cycle time = 2.4 minutes
Q: snip
A: Cycle time in a manufacturing unit is the complete duration taken to produce a product. Cycle time…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: This problem can be solved using: Cycle time = Available time / Desired output
Q: 1.DG Fast Food has four activities in serving a customer: greet customer, take order, process order,…
A: As per Bartleby's guidelines, we only answer the first question in case multiple questions are asked…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given - A local toy manufacturer is using a production line that runs 8 hours per day and produces a…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: The answer is below:
Q: What is the outcome when a bottleneck resource is augmented with more capacity? a. Throughput time…
A: The time taken to complete a certain task is called throughput time. An organization can determine…
Q: A set of tools costs Php 1,800 and can be ground twenty times. Each regrinding costs Php 18.00 and…
A:
Q: Discuss the difference between resource loading and resource leveling, and provide an example of…
A: Resource Loading is the allocation of the right resources to right set of tasks at the right time.…
Q: A manufacturer needs to produce 300 coffee pots per 8 hour day. The discrete tasks required to…
A:
Q: The Neptune’s Den Machine Shop specializes in overhauling outboard marine engines. Some engines…
A: SPT and EDD are the job sequencing rule in operation management which stands for shortest processing…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Cycle time is the total actual time spend to produce an item in the production process.
Q: In a job shop, effective capacity is only 88 percent of design capacity, and actual output is 69…
A: Design capacity can be referred to as the maximum production rate that can be utilized from…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Working hour = 8 hours per day The total task to perform =7 task Daily demand= 100 toys Total Task…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A:
Q: What cycle time would match capacity and demand if demand is 173 units a day, there are 2 shift(s)…
A: Below is the solution:-
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: What is the outcome when a bottleneck resources is augmented with more capacity? Will throughput…
A: The assets that need a lot of time working in the supply chain for a particular demand are…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Demand is the total quantity of goods and services for which the consumers are ready to pay…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Given Data: Task Time taken A 2.73 B 2.01 C 2.13 D 2.0 E 2.61…
Q: Canine Kernels Company (CKC) manufactures two different types of dog chew toys (A and B, sold in…
A: Available minutes per workstation per week = 40 hours × 60 minutes an hour = 2400 minutes The demand…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: The answer is as follows:
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: Demand is the total quantity of products and services for which the consumers are willing to pay…
Q: A facility has a maximum capacity of 4,000 units per day using overtime and skipping the daily…
A: Capacity utilization rate is a measure of a company's performance on the basis of how close it has…
Q: If all direct materials are placed in process at the beginning of production, determine the direct…
A: Drawings Department Direct materials and conversion equivalent units of production for June.…
Q: A.J.’s Wildlife Emporium manufactures two unique birdfeeders (Deluxe and Super Duper) that are…
A: Bottleneck based approach refers to techniques is used to determine the system performance. The…
Q: The desired daily output for an assembly line is 540 units. This assembly line will operate 720…
A: workstation cycle time = Available Production time / Customer Demand Available Production time =…
Q: A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy…
A: This problem can be solved using:Cycle time = Available time / Desired output
Breakeven Analysis
Break Even Analysis is a term used in business, cost accounting and economics. It refers to a point where the total cost incurred becomes equal to the total revenue earned. Break Even Analysis determines the number of units to be sold to earn the revenue required to cover the total costs. Total cost is a sum total of fixed and variable costs.
Process analysis
The term process analysis can be defined as breakdown of production process into different phases that converts inputs into output. A series of routine activities are incorporated using organizational resources with a view to achieve operational excellence.
Step by step
Solved in 2 steps
- A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed . The daily demand is 100 toys . Times of the tasks are 2.73,2.01 ,2.13,2.0,2.61,2.71 and 2.95 minutes for A,B,C,D,E,F, and G, respectively . However , due to the nature of the product there are precedencerules that must be observed . Such that Task A does not need any predecessors ; task B requires task A to becompleted . To start task C and task Deach require task B to be completed . Task must be completed prior to stating task E. Task F needs both task and task E to be completed . Finally , task G can start only once task F is completed . Given we apply the most remaining tasks rule for balancing the assembly line , with ties broken according to longesttask time first , the tasks that will be assigned to the THIRD workstation are a. D and F b . None is the correct answer c. D only d. E only e. B, C , and DA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 261, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task Cand task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed. What is the minimum number of workstations needed? O a. None of them O b. 8 O c. 4 d. 2 Oe. e to searchA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed.Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according ?to longest task time first, What will the estimated idle time in minutes for FIRST workstation 0.06 .a O None is the correct anser .b O 0.09 .c O 1.00 .d O 1.85 .e O ace 近
- A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task Fis completed.Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the THIRD workstation are O a. Dand F O b. Eonly O c. Donly O d. None is the correct answer Oe. B, C, and DA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed.What should be the calculated cycle time in minutes? O a. 0.9 O b. 4.4 O c. None is correct O d. 4.5 O e. 4.8 US PAGE NEXT PAGE MacBA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed. Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, What will the estimated idle time in minutes for FOURTH workstation? O a. 0.06 O b. None is the correct answer О с. 1.85 O d. 1.00 e. 0.09
- A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task Cand task D, each require task B to be completed. Task C must be completed prior to stating task E. Task Fneeds both taskD and task E to be completed. Finally, task G can start only once task F is completed. Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, What will the estimated idle time in minutes for SECOND workstation? Oa. None is the correct answer O b. 0.09 Oc 1.85 O d. 1.00 O e. 0.06A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed. Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, What will the estimated idle time in minutes for THIRD workstation? O a. 1.00 O b. 0.06 O c. None is the correct answer O d. 1.85 e. 0.09A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed. Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the THIRD workstation are O a. E only O b. D and F OC. B, C, and D d. None is the correct answer O e. D only
- A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01,2.13, 2.0, 2.61,2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed.Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the THIRD workstation are О a. В. С, and D O b. Donly Oc Eonly O d. Dand F None is the correct answerA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed.Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the SECOND workstation are, O a. Conly b. None is the correct answer O c. Cand E O d. Eonly O e. A, B, and CA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01, 2.13, 2.0, 2.61, 2.71, and 2.95 minutes for A, B, C, D, E, F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D, each require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed. Finally, task G can start only once task F is completed. Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the THIRD workstation are O a. E only O b. Dand F O c. None is the correct answer O d. B, C, and D O e. Donly