Concept explainers
a
Interpretation:
Run time of batches of wooden slates.
Concept Introduction: Materials Requirement Planning is a process in which planning is made for the requirement of raw material required for manufacturing of the finished product.
a
Explanation of Solution
Number of units demanded = 14,600 per year
Production rate per day = 160 units
Daily demand of units = 40 units.
Run time is calculated by dividing the demand and the production rate.
Hence, the run time for one setup is 18.25 days per setup.
b
Interpretation:
Run size of batches of wooden slates.
Concept Introduction: Materials Requirement Planning is a process in which planning is made for the requirement of raw material required for manufacturing of the finished product.
b
Explanation of Solution
Run size is calculated by multiplying the run time and the production rate per day.
Hence, the run time for one set up is 2,920 units per setup.
c
Interpretation:
Maximum number of wooden slates o be used for wooden crates.
Concept Introduction: The efficiency of output is the actual productivity generated compared with the planned or effective capacity. It is usually calculated by dividing actual output by effective capacity.
c
Explanation of Solution
Maximum inventory is calculated by subtracting the number of units per setup from the run size.
Number of units per setup is calculated by multiplying the number of days per setup and the daily demand.
Maximum inventory is calculated by subtracting the number of units per setup from the run size.
Hence, the maximum inventory is 2,190 units.
Want to see more full solutions like this?
Chapter 10 Solutions
Practical Operations Management
- A finished goods inventory on average contains 10,000 units. Demand averages 1,500 units per week. Given that the process runs 50 weeks a year, what is the expected inventory turn for the inventory? Assume that each item held in inventory is valued at about the same amount.arrow_forwardCompute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 80 parts. A part requires 2 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 5 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If reguired, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time 8 V min 8 V min Non-value-added time 632 X min 48 x min Total lead time 640 x min 56 x min Value-added ratio…arrow_forwardValue maximization is one of the main goal of the firm. It means a. maximizing the long term value of the firm b. maximizing the short term value of the firm c. maximizing the long term debts/loans of the firm d. maximizing the short term profit of the firmarrow_forward
- You are the president of XYZ Manufacturing company. You have recently learned about the following issue: A month ago, the company’s general manager (GM) told one of the line managers to produce an extra 15,000 units of a product so that there would be inventory in stock for the next time the item is ordered. Last week, the GM scolded the line manager for having 15,000 units of the item in stock. The GM told the line manager that producing excess inventory costs the company money and should never be done. The GM then puts the line manager on a performance plan. This is not the first time you have heard about the GM telling an employee to do one thing only to criticize him or her for doing it later. This employee feels very frustrated by this, but does not want to make a formal complaint because she has seen other employees lose their jobs or get demoted for questioning the GM. Create an outline that proposes a leadership solution to this issue. The outline should address the following:…arrow_forwardA company manufactures hair dryers. It buys some of the components, but it makes the heating elements, which it can produce at the rate of 800 per day. Hair dryers are assembled daily, 250 days a year, at a rate of 300 per day. Because of the disparity between the production and usage rates, the heating elements are periodically produced in batches of 2,000 units. Approximately how many batches of heating elements are produced annually? If production on a batch begins when there is no inventory of heating elements on hand, how much inventory will be on hand two days later? The same equipment that is used to make the heating elements could also be used to make a component for another of the firm’s products. That job would require four days, including setup. Setup time for making a batch of heating elements is a half day. Is there enough time to do this job between productions of batches of heating elements? Explain.arrow_forwardA firm sells two products. Product R sells for $20; its variable cost is $6. Product S sells for $50; its variable cost is $30. Product R accounts for 60 percent of the firm’s sales, while S accounts for 40 percent. The firm’s fixed costs are $4 million annually. Calculate the firm’s break-even pointarrow_forward
- Dairy company SG is producing milk at a fixed rate of 5,000 gallons/hour. The total customer order over a day is 100,000 gallons of milk. This demand is distributed evenly from 8:00 am to 6:00 pm. If there is no milk available, customers will wait until enough is produced to satisfy your orders. The company starts to produce at 8 am with 25,000 gallons in finished goods inventory. In the end, after that all the demand has been met, the plant continues producing until the stock of products finished is restored to 25,000 gallons. When answering the following questions, please address the trucks / milk as a continuous flow process. Start by drawing a graphic indicating how much milk is in stock and how much milk is “on hold” throughout the day. a) At what time of day will customers have to wait for their orders to be filled? b) At what time will customers stop waiting? c) Suppose the milk is collected in trucks with a capacity of 1,250 gallons each. What is the maximum number of trucks…arrow_forwardA Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 20-minute setup. Once in production, the PCB machine requires only 0.15 minute per board. Assume there is ample demand. Currently, the PCB machine produces 500 boards between setups. Given this operating process, what is the utilization of the PCB machine? answer:________percentarrow_forwardLuther’s company has just received an order for 1,200 of its Flying Z machines. The customer wants 350 of them next year, 400 the year after, and the balance in the third year. Luther estimates that after one year of production, the average worker with this one year of experience can produce 12 machines per year. However, new workers are 25% less productive in the first year. He has 25 workers with at least one year of experience to work on the first year’s order. He will need to hire new workers for any production that exceeds what these workers can produce. To further complicate matters, he believes 10% of his current experienced workforce will turnover at the end of the first year and the number of workers from his current workforce should remain steady after that. His history also shows that only 75% of new hires stay after their first year. Given these facts, how many total people should Luther plan to hire over the duration of this order? Please solve in excel. Group of answer…arrow_forward
- Refers to the range of the number of items produced by the operation over a givenperiod of time. choose the correct answer(1) Volume of output.(2) Variation of output.(3) Variety of output.(4) Transformation process.(5) Transmission processarrow_forwardIn the "push" system, products are manufactured and stored as buffers in anticipation of demand.Select one:a. Falseb. Truearrow_forwardA Rhode Island company produces communion wafers for churches around the countryand the world. The little company produces a lot of wafers, several hundred million peryear. When in production, the process produces wafers at the rate of 100 per second.During this production process, the wafers must spend 15 minutes passing througha cooling tube. How many wafers does the cooling tube hold, on average, when inproduction (in other words, don’t count the time they are not in production)?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.