Question
Chapter 13, Problem 1BE
a.
To determine
Compute the value added, non-value added and lead time of this process.
b.
To determine
Compute the value-added ratio (rounded to one place).
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Lead Time
Pockets Inc. manufactures cargo pants in the cutting and sewing process. Cargo pants are manufactured in batches of 30. The cutting time is
4 minutes per unit. The sewing time is 12 minutes per unit. It takes 20 minutes to move a batch of jeans from cutting to sewing.
a. Compute the value-added, non-value-added, and total lead time of this process.
Value-added lead time
Non-value-added lead time
Total lead time
b. Compute the value-added ratio. Round to one decimal place.
%
minutes
minutes
minutes
8. Rough Riders Inc. manufactures jeans in the cutting and sewing process. Jeans are manufactured in 50-jean batch sizes. The cutting time is 6 minutes and the sewing time is 15 minutes per jean. It takes 5 minutes to move a batch of jeans from cutting to sewing.
(a) Compute the value-added, non-value-added, and total lead time of this process.
(b) Compute the value-added ratio. Round to one decimal place.
Lead Time
Rough Riders Inc. manufactures jeans in the cutting and sewing process. Jeans are manufactured in 50-jean batch sizes. The cutting time is 6 minutes per jean. The sewing time is 15 minutes per jean. It takes 5 minutes to move a batch of jeans from cutting to sewing.
a. Compute the value-added, non-value-added, and total lead time of this process.
Value-added lead time
minutes
Non-value-added lead time
minutes
Total lead time
minutes
b. Compute the value-added ratio. Round to one decimal place. %
Chapter 13 Solutions
Managerial Accounting
Ch. 13 - What is the benefit of the lean philosophy?Ch. 13 - Prob. 2DQCh. 13 - Prob. 3DQCh. 13 - Prob. 4DQCh. 13 - Prob. 5DQCh. 13 - Why would a lean manufacturer strive to produce...Ch. 13 - Prob. 7DQCh. 13 - Prob. 8DQCh. 13 - Prob. 9DQCh. 13 - Prob. 10DQ
Ch. 13 - Prob. 11DQCh. 13 - Prob. 12DQCh. 13 - Prob. 13DQCh. 13 - Prob. 1BECh. 13 - Prob. 2BECh. 13 - Prob. 3BECh. 13 - Prob. 4BECh. 13 - Prob. 5BECh. 13 - Prob. 1ECh. 13 - Prob. 2ECh. 13 - Lean principles Rag Swag Inc. manufactures various...Ch. 13 - Prob. 4ECh. 13 - Reduce setup time Vernon Inc. has analyzed the...Ch. 13 - Compute lead time Jackson Fabricators Inc....Ch. 13 - Calculate lead time Williams Optical Inc. is...Ch. 13 - Prob. 8ECh. 13 - Prob. 9ECh. 13 - Prob. 10ECh. 13 - Prob. 11ECh. 13 - Prob. 12ECh. 13 - Lean accounting Modern Lighting Inc. manufactures...Ch. 13 - Prob. 14ECh. 13 - Prob. 15ECh. 13 - Prob. 16ECh. 13 - Prob. 17ECh. 13 - Prob. 18ECh. 13 - Process activity analysis The Brite Beverage...Ch. 13 - Prob. 20ECh. 13 - Prob. 21ECh. 13 - Lean principles Bright Night, Inc., manufactures...Ch. 13 - Prob. 2PACh. 13 - Lean accounting Dashboard Inc. manufactures and...Ch. 13 - Pareto chart and cost of quality report for a...Ch. 13 - Prob. 1PBCh. 13 - Lead time Master Chef Appliance Company...Ch. 13 - Lean accounting Com-Tel Inc. manufactures and...Ch. 13 - Pareto chart and cost of quality report for a...Ch. 13 - Prob. 1MADCh. 13 - Prob. 2MADCh. 13 - Prob. 3MADCh. 13 - Prob. 4MADCh. 13 - Ethics in Action In August, Lannister Company...Ch. 13 - Prob. 3TIFCh. 13 - Prob. 1CMACh. 13 - Prob. 2CMACh. 13 - In measuring the cost of quality, which one of the...Ch. 13 - Prob. 4CMA
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Pockets Inc. manufactures cargo pants in the cutting and sewing process. Cargo pants are manufactured in batches of 30. The cutting time is 4 minutes per unit. The sewing time is 12 minutes per unit. It takes 20 minutes to move a batch of jeans from cutting to sewing. a. Compute the value-added, non-value-added, and total lead time of this process. Line Item Description Lead Time Value-added lead time fill in the blank 1 minutes Non-value-added lead time fill in the blank 2 minutes Total lead time fill in the blank 3 minutes b. Compute the value-added ratio. Round to one decimal place.fill in the blank 1 of 1%arrow_forwardLead Time Blues Inc. manufactures jeans in the cutting and sewing process. Jeans are manufactured in 40-jean batch sizes. The cutting time is 5 minutes per jean. The sewing time is 20 minutes per jean. It takes 2 minutes to move a batch of jeans from cutting to sewing. a. Compute the value-added, non-value-added, and total lead time of this process. Value-added lead time ? minutes Non-value-added lead time ? minutes Total lead time ? minutes b. Compute the value-added ratio. Round to one decimal place.fill in the blank 4 %arrow_forwardMCE Craig, Inc., has provided the following information for one of its products for each hour of production: Actual velocity: 200 units (per hour) Move time: 11 minutes Inspection time: 12 minutes Rework time: 12 minutes 1. MCE is 0.42 2. What is the theoretical cycle time? Calculate MCE using actual and theoretical cycle times. If required, round your answers to two decimal places. Theoretical cycle time fill in the blank minutes Actual cycle time 0.3 minutes MCE fill in the blankarrow_forward
- 1. ABC Co. manufactures desks in the finishing and assembly process. Desks are manufactured in 20 unit batches. The finishing time is 12 minutes and the assembly time is 8 minutes per desk. It takes 20 minutes to move a batch of desks from finishing to assembly. (a) Compute the value added, non-value added, and total lead time of this process. (b) Compute the value-added ratio (round to one decimal place if necessary). (c) A study was conducted resulting in the following changes: Desks made in 30 unit batches Finishing time reduced to 8 minutes Move time reduced to 16 minutes Compute the total lead time and value added ratio after the process changes: 2. Johnny Co. operates under the lean philosophy. As a result, it has a production cell for its power drills. The…arrow_forwardConsumption Ratios; Activity Rates Dienestar Company produces two types of get-well cards: scented and regular. Drivers for the four activities are as follows: Scented Cards Regular Cards Inspection hours Setup fours Machine hours Inspection hours Setup fours 140 100 Number of moves The following activity data has been collected: Inspecting products Setting up equipment Machining Moving materials Required: 210 235 Rates: 100 20 1. Calculate the commption ratus for the four drivers. Round your answers to two decimal places. Scented Cards Regular Cards 0.42 ✔ 0.17 V 0.74 ✓ pocting produds Setting up equipment Machining Moving material 600 0.50 0.83 ✔ 0.26 ✔ 0.77 ✔ 70 $4,970 4,740 6.320 1,290 Machine hours Number of moves 2. Which of the following statements indicate there is product diversity? Significant variation in the consumption ratios from driver to driver Explain the significance of product diversity for decision-making it the company Chooses to use inachine uus to assign all…arrow_forwardCharlotte Company produces folding chairs. It takes the company 18,000 hours to produce 90,000 chairs. Required: A. What is the velocity?fill in the blank 1 units per hour B. What is the cycle time in hours? Round your answer to one decimal place.fill in the blank 2 hoursarrow_forward
- Best Ink produces printers for personal computers. The following information is available for production of a recent order of 500 printers. Process time 16.0 hours Inspection time 3.5 hours Move time 9.0 hours Wait time 21.5 hours 1. Compute the company’s manufacturing cycle time. 2. Compute the company’s manufacturing cycle efficiency. 3. Assume the company wishes to increase its manufacturing cycle efficiency to 0.80. If process time is unchanged, what is the maximum number of hours of non-value-added time the company can have and meet this goal?arrow_forwardChristmas Express makes wreaths in batch sizes of 19. The cutting and assembly process takes 2 minutes per wreath, and the decorating process time is 15 minutes per wreath. It takes 5 minutes to move the wreaths from the cutting and assembly process to the decorating process. a. Compute the value-added, non-value-added, and total lead times of the wreath process. Value-added lead time Non-value-added lead time: Move time Within-batch wait time Total lead time minutes minutes b. Compute the value-added ratio. Round to one decimal place. %arrow_forwardNavern Coporation manufactures and sells custom home elevators. From the time an order is placed until the time the elevator is installed in the customer's home averages 44 days. This 44 days is spent as follows: Wait time 12 days Inspection time Process time Move time Queue time 12 days 5 days 6 days 9 days What is Navern's manufacturing cycle efficiency (MCE) for its elevators? Multiple Cholce 38.6% 15.6% 61.4% 591% 65°F Cloudy search DELLarrow_forward
- The cost of materials for product A are as follows. Material W: $2,250 Material X: $3,000 Material Y: $3,600 Material Z: $150 If the material proportions were displayed on a pie chart, how many degrees would material Y represent? A 90 degrees B 120 degrees C 144 degrees D 204 degreesarrow_forwardChristmas Express makes wreaths in batch sizes of 34. The cutting and assembly process takes 5 minutes per wreath, and the decorating process time is 8 minutes per wreath. It takes 5 minutes to move the wreaths from the cutting and assembly process to the decorating process. a. Compute the value-added, non-value-added, and total lead times of the wreath process. Value-added lead time fill in the blank 1 minutes Non-value-added lead time: Move time fill in the blank 2 Within-batch wait time fill in the blank 3 Total lead time fill in the blank 4 minutes b. Compute the value-added ratio. Round to one decimal place.fill in the blank 5 %arrow_forwardChristmas Express makes wreaths in batch sizes of 23. The cutting and assembly process takes 4 minutes per wreath, and the decorating process time is 12 minutes per wreath. It takes minutes to move the wreaths from the cutting and assembly process to the decorating process. a. Compute the value-added, non-value-added, and total lead times of the wreath process. Value-added lead time Non-value-added lead time: Move time Within-batch wait time minutes Total lead time b. Compute the value-added ratio. Round to one decimal place. % minutesarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubCornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningManagerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage Learning
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
What is variance analysis?; Author: Corporate finance institute;https://www.youtube.com/watch?v=SMTa1lZu7Qw;License: Standard YouTube License, CC-BY