Production and Operations Analysis, Seventh Edition
7th Edition
ISBN: 9781478623069
Author: Steven Nahmias, Tava Lennon Olsen
Publisher: Waveland Press, Inc.
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 12.6, Problem 26P
Summary Introduction
Interpretation:
Con and Pro positions on using optimization models to design control charts.
Concept Introduction:Control charts are used to measure the effectiveness of the process determining the average value and control limits of the process. The Upper Control Limit (UCL) is the larger value and the Lower Control limit (LCL) is the smaller value of the sample
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The time to deliver packaged containers by a logistics company is found fromsamples of size 4. The mean and standard deviation of delivery times is estimated tobe 140 hours and 6 hours, respectively.(a) Find the 2 sigma and 3 sigma control limits for the average delivery time.(b) Explain a type I and type II error specifically in this context.(c) If the mean delivery time shifts to 145 hours, what is the probability of notdetecting this by the second sample after the shift?(d) What is the ARL? Explain
Nocaf Drinks, Inc., a producer of decaffeinated coffee, bottles Nocaf. Each bottle should have a net
weight of 4 ounces. The machine that fills the bottles with coffee is new, and the operations manager
wants to make sure that it is properly adjusted. The operations manager takes a sample of n = 8 bottles
and records the average and range in ounces for each sample. The data for several samples are given in
the following table. Note that every sample consists of 8 bottles.
SAMPLE
SAMPLE
SAMPLE
SAMPLE
SAMPLE
RANGE
AVERAGE
SAMPLE
RANGE
AVERAGE
0.41
4.00
E
0.56
4.17
B
0.55
4.16
F
0.62
3.93
0.44
3.99
0.54
3.98
0.48
4.00
H
0.44
4.01
Is the machine properly adjusted and in control?
Nocaf Drinks, Inc., a producer of decaffeinated coffee, bottles Nocaf. Each bottle should have a net
weight of 4 ounces. The machine that fills the bottles with coffee is new, and the operations manager
wants to make sure that it is properly adjusted. The operations manager takes a sample of n = 8 bottles
and records the average and range in ounces for each sample. The data for several samples are given in
the following table. Note that every sample consists of 8 bottles.
SAMPLE
SAMPLE
SAMPLE
RANGE
SAMPLE
SAMPLE
RANGE
AVERAGE
SAMPLE
AVERAGE
0.41
4.00
E
0.56
4.17
B
0.55
4.16
F
0.62
3.93
C
0.44
3.99
0.54
3.98
0.48
4.00
H
0.44
4.01
Is the machine properly adjusted and in control?
Chapter 12 Solutions
Production and Operations Analysis, Seventh Edition
Ch. 12.1 - Prob. 2PCh. 12.1 - Prob. 3PCh. 12.1 - Prob. 4PCh. 12.1 - Prob. 5PCh. 12.1 - Prob. 6PCh. 12.2 - Prob. 7PCh. 12.2 - Prob. 8PCh. 12.2 - Prob. 9PCh. 12.2 - Prob. 10PCh. 12.2 - Prob. 11P
Ch. 12.2 - Prob. 12PCh. 12.2 - Prob. 13PCh. 12.3 - Prob. 14PCh. 12.3 - Prob. 15PCh. 12.3 - Prob. 16PCh. 12.3 - Prob. 17PCh. 12.4 - Prob. 18PCh. 12.4 - Prob. 19PCh. 12.4 - Prob. 20PCh. 12.4 - Prob. 21PCh. 12.5 - Prob. 22PCh. 12.6 - Prob. 23PCh. 12.6 - Prob. 24PCh. 12.6 - Prob. 25PCh. 12.6 - Prob. 26PCh. 12.6 - Prob. 27PCh. 12.6 - Prob. 28PCh. 12.9 - Prob. 29PCh. 12.9 - Prob. 30PCh. 12.9 - Prob. 31PCh. 12.9 - Prob. 32PCh. 12.9 - Prob. 33PCh. 12.10 - Prob. 34PCh. 12.10 - Prob. 35PCh. 12.10 - Prob. 37PCh. 12.10 - Prob. 38PCh. 12.10 - Prob. 39PCh. 12.10 - Prob. 40PCh. 12.11 - Prob. 41PCh. 12.11 - Prob. 42PCh. 12.11 - Prob. 43PCh. 12.11 - Prob. 44PCh. 12.12 - Prob. 46PCh. 12.12 - Prob. 47PCh. 12.12 - Prob. 48PCh. 12 - Prob. 49APCh. 12 - Prob. 50APCh. 12 - Prob. 51APCh. 12 - Prob. 52APCh. 12 - Prob. 53APCh. 12 - Prob. 54APCh. 12 - Prob. 55APCh. 12 - Prob. 57APCh. 12 - Prob. 58APCh. 12 - Prob. 59APCh. 12 - Prob. 60APCh. 12 - Prob. 61APCh. 12 - Prob. 62APCh. 12 - Prob. 63APCh. 12 - Prob. 64APCh. 12 - Prob. 65APCh. 12 - Prob. 66APCh. 12 - Prob. 67APCh. 12 - Prob. 68APCh. 12 - Prob. 69APCh. 12 - Prob. 70AP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 26. Discuss the following pro and con positions on using optimization models to design control charts: Con: “These models are useless to me because I don’t feel I can accurately estimate the values of the required inputs." Pro: “The choice of specific values of n and k in the construction of X bar charts means that you are assuming values for the various system costs and parameters. You might as well take the bull by the horns and obtain the best estimates you can and use those to design the X bar chart."arrow_forwardQuestion 3 (a) (b) (e) Dick Miller, a Quality Analyst in Miller Brewing Company, wants to construct a mean and range chart for controlling a packaging process for a new Miller Lite bottle. Each day last week, he randomly selected five packages and weighed each DAY Weight Weight Weight Weight Weight Mean Range 4 2 Monday 98 98 97 98 96 97.4 Tuesday 103 101 99 101 101 101 Wednesday 101 99 98 100 102 100 4 101 100 99 100 100 100 2 Thursday 102 104 100 102.2 Friday 103 102 100 97 101 Saturday 106 103 99 Keep two decimal places when calculating your control limits. n rlin blanks below. 寸 4.arrow_forwardSouth Africa Airways would like to monitor its airline’s performance. Each week for the past 20 weeks, they checked each week a random sample of 100 flight arrivals for “one-time” performance. The table that follows contains the number of flights that did not meet South Africa Airways definition of “one time”: Week Late flights 1 2 2 4 3 10 4 4 5 1 6 1 7 13 8 9 9 11 10 0 11 3 12 4 13 2 14 2 15 8 16 2 17 3 18 7 19 3 20 2 Which control chart is appropriate to analyze the above data? Justify your answerarrow_forward
- South Africa Airways would like to monitor its airline’s performance. Each week for the past 20 weeks, they checked each week a random sample of 100 flight arrivals for “one-time” performance. The table that follows contains the number of flights that did not meet South Africa Airways definition of “one time”: Week Late flights 1 2 2 4 3 10 4 4 5 1 6 1 7 13 8 9 9 11 10 0 11 3 12 4 13 2 14 2 15 8 16 2 17 3 18 7 19 3 20 2 Calculate the upper and lower control limits for this chart.arrow_forwardSTAR Co. provides paper to smaller companies with volumes that are not large enough to warrant dealing directly with the paper mill. STAR receives 100-feet-wide paper rolls from the mill and cuts the rolls into smaller rolls of widths 12, 15, and 30 feet. The demands for these widths vary from week to week. The following cutting patterns have been established. Pattern Number 12‐ft 15‐ft 30‐ft Trim Loss (ft) 1 0 6 0 10 2 0 0 3 10 3 8 0 0 4 4 3 0 2 4 5 7 1 0 1 Trim loss is the leftover paper from a pattern (e.g., for pattern 4, 3(12) + 0(15) + 2(30) = 96 feet used results in 100 − 96 = 4 foot of trim loss). Orders in hand for the coming week are 5,680 12-foot rolls, 1,670 15-foot rolls, and 3,340 30-foot rolls. Any of the three types of rolls produced in excess of the orders in hand will be sold on the open market at the selling price. No inventory is held. (a) Formulate an integer programming model that will determine how many 100-foot rolls to cut into each of the…arrow_forward6. List and explain in detail why we include disturbance term or error term in the model?arrow_forward
- A scatter diagram is useful to determine if a relationship exists between two variables.TrueORFalsearrow_forwardSTAR Co. provides paper to smaller companies with volumes that are not large enough to warrant dealing directly with the paper mill. STAR receives 100-feet-wide paper rolls from the mill and cuts the rolls into smaller rolls of widths 12, 15, and 30 feet. The de- mands for these widths vary from week to week. The following cutting patterns have been established: Pattern Number 12-ft 15-ft 30-ft Trim Loss (ft) 6. 10 3 10 3 8 4 2 5 7 ter 9 Integer Linear Optimization Models Trim loss is the leftover paper from a pattern (for example, for pattern 4, 2(12) + 1(15) + 2(30) = 99 feet used results in 100 – 99 = 1 foot of trim loss). Demands this week are 5670 12-foot rolls, 1680 15-foot rolls, and 3350 30-foot rolls. Develop an all-integer model that will determine how many 100-foot rolls to cut into each of the five patterns in order to meet demand and minimize trim loss (leftover paper from a pattern). --arrow_forwardTwo processes are used to produce forgings used in an aircraft wing assembly. Of 200 forgings selected from process 1.12 do not conform to the strength specifications. Where as of 300 forgings selected from process. 2.6 are nonconforming. Test the hypothesis that the two processes have identical fractions nonconforming.Use a=0.05, and explain the resultarrow_forward
- The Scottsdale fire department aims to respond to fire calls in 7 minutes or less, on average. Response times are normally distributed with a standard deviation of 1 minute 42 seconds. Would a sample of 18 fire calls with a mean response time of 7 minutes 21 seconds provide sufficient evidence to show that the goal is not being met at α = .01?arrow_forwardBottles for room spray are supposed to weigh exactly 16 oz. Inspectors want to develop process control charts. They take six boxes of five bottles each and weigh them. They obtain the following data. The mean weights of each of the 6 samples are 14.6, 16.5, 18.1, 13.2, 16, and 14.8 respectively. Likewise, the range values for the each of 6 samples are 0.7, 0.5,0.4, 0.2, 0.4, and 0.9 respectively. For the X-bar charts and R-charts, the Parameters, A2, D3 and D4 are respectively. O a. 0.73, 0.00, 2.28 O b. 0.25, 0.31, 1.69 Oc. 0.37,0.14, 1.86 O d. None of them O e. 0.58,0.00, 2.11arrow_forwardA manufacturing process that is in control, reports Select one: a. Favorable variances offset by unfavorable variances. b. Mostly favorable variances c. All favorable variances. d. No variances.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,