Chapter 4, Problem 110P
Summary Introduction
To determine: The way to maximize the number of consecutive days off received by these employees.
Linear programming:
It is a mathematical modeling procedure where a linear function is maximized or minimized subject to certain constraints. This method is widely useful in making a quantitative analysis which is essential for making important business decisions.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.
JOHNSON’S RULE
Five specialty jobs at a La Crosse, Wisconsin, tool and die shop must be processed through two workcenters (drill press and lathe). The time for processing each job follows:Work (processing) Time for Jobs (hours)JOBWORK CENTER 1(DRILL PRESS)
WORK CENTER 2(LATHE)A5 2B3 6C8 4D 10 7E 7 12
A manufacturing plant produces a product 'A' that requires one unit of 'B' and ½ unit of 'C'. Each unit of 'B' is comprised of one unit of 'D', two units of 'E', and one unit of 'F'. Each unit of 'C' requires ½ unit of 'G' and three units of 'H'. The manufacturing lead times for the components are as follows: 'A' - two weeks, 'B' - one week, 'C' - two weeks, 'D' - two weeks, 'E' - three weeks, 'F' - one week, 'G' - two weeks, 'H' - one week. There are 20 units in stock for each of these components. 100 units of 'A' are needed for delivery in seven weeks: a) Develop the product structure and indexed bill of materials for the product. b) Create a gross and net requirements plan for the manufacturer of the product.
Chapter 4 Solutions
Practical Management Science
Ch. 4.2 - Prob. 1PCh. 4.2 - Prob. 2PCh. 4.2 - Prob. 3PCh. 4.2 - Prob. 4PCh. 4.2 - Prob. 5PCh. 4.2 - Prob. 6PCh. 4.3 - Prob. 7PCh. 4.3 - Prob. 8PCh. 4.3 - Prob. 9PCh. 4.3 - Prob. 10P
Ch. 4.3 - Prob. 11PCh. 4.3 - Prob. 12PCh. 4.4 - Prob. 13PCh. 4.4 - Prob. 14PCh. 4.4 - Prob. 15PCh. 4.4 - Prob. 16PCh. 4.4 - Prob. 17PCh. 4.4 - Prob. 18PCh. 4.4 - Prob. 19PCh. 4.5 - Prob. 20PCh. 4.5 - Prob. 21PCh. 4.5 - Prob. 22PCh. 4.5 - Prob. 23PCh. 4.5 - Prob. 24PCh. 4.5 - Prob. 25PCh. 4.6 - Prob. 26PCh. 4.6 - Prob. 27PCh. 4.6 - Prob. 28PCh. 4.6 - Prob. 29PCh. 4.7 - Prob. 30PCh. 4.7 - Prob. 31PCh. 4.7 - Prob. 32PCh. 4.7 - Prob. 33PCh. 4.7 - Prob. 34PCh. 4.7 - Prob. 35PCh. 4.7 - Prob. 36PCh. 4.7 - Prob. 37PCh. 4.7 - Prob. 38PCh. 4.7 - Prob. 39PCh. 4.7 - Prob. 40PCh. 4.8 - Prob. 41PCh. 4.8 - Prob. 42PCh. 4.8 - Prob. 43PCh. 4.8 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63PCh. 4 - Prob. 64PCh. 4 - Prob. 65PCh. 4 - Prob. 66PCh. 4 - Prob. 67PCh. 4 - Prob. 68PCh. 4 - Prob. 69PCh. 4 - Prob. 70PCh. 4 - Prob. 71PCh. 4 - Prob. 72PCh. 4 - Prob. 73PCh. 4 - Prob. 74PCh. 4 - Prob. 75PCh. 4 - Prob. 76PCh. 4 - Prob. 77PCh. 4 - Prob. 78PCh. 4 - Prob. 79PCh. 4 - Prob. 80PCh. 4 - You want to take out a 450,000 loan on a 20-year...Ch. 4 - Prob. 82PCh. 4 - Prob. 83PCh. 4 - Prob. 84PCh. 4 - Prob. 85PCh. 4 - Prob. 86PCh. 4 - Prob. 87PCh. 4 - Prob. 88PCh. 4 - Prob. 89PCh. 4 - Prob. 90PCh. 4 - Prob. 91PCh. 4 - Prob. 92PCh. 4 - Prob. 93PCh. 4 - Prob. 94PCh. 4 - Prob. 95PCh. 4 - Prob. 96PCh. 4 - Prob. 97PCh. 4 - Prob. 98PCh. 4 - Prob. 99PCh. 4 - Prob. 100PCh. 4 - Prob. 101PCh. 4 - Prob. 102PCh. 4 - Prob. 103PCh. 4 - Prob. 104PCh. 4 - Prob. 105PCh. 4 - Prob. 106PCh. 4 - Prob. 107PCh. 4 - Prob. 108PCh. 4 - Prob. 109PCh. 4 - Prob. 110PCh. 4 - Prob. 111PCh. 4 - Prob. 112PCh. 4 - Prob. 113PCh. 4 - Prob. 114PCh. 4 - Prob. 115PCh. 4 - Prob. 116PCh. 4 - Prob. 117PCh. 4 - Prob. 118PCh. 4 - Prob. 119PCh. 4 - Prob. 120PCh. 4 - Prob. 121PCh. 4 - Prob. 122PCh. 4 - Prob. 123PCh. 4 - Prob. 124PCh. 4 - Prob. 125PCh. 4 - Prob. 126PCh. 4 - Prob. 127PCh. 4 - Prob. 128PCh. 4 - Prob. 129PCh. 4 - Prob. 130PCh. 4 - Prob. 131PCh. 4 - Prob. 132PCh. 4 - Prob. 133PCh. 4 - Prob. 134PCh. 4 - Prob. 135P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- An industrial engineer has designed two alternative methods for accomplishing a production job. Both methods involve the acquisition of the same working place and other capital equipment to be used for this job only. Method A calls for a crew consisting of three men each costing Php30/hr. This method will result in the production of 10 units per hour of which two will be reject. Method B calls for a crew of two men each costing Php35/hr and should result in the production of eight units per hour of which one will be reject. The cost of the direct material lost in each reject is Php20. If a certain total number of units is to be produced find which method is economical?arrow_forwardA consulting company must hire 15 new associates per year to replace those who haveleft the company for other positions or have retired. The company employs 120 associates overall. How long is the average associate employed at the consulting company?arrow_forwardA company produces motor cycle seats. The company has two production lines. The production rate for line one is 50 seats per hour and for line two it is 60 seats per hour. The company has entered into a contract to supply1200 seats daily to another company. Currently, the normal operation period for each line is 8 hours. The production manager 4 | P a g eof the company is trying to determine the best daily operation hours for the two lines. He sets the priorities to achieve his goals as given below:- P1: produce and deliver 1200 seats daily- P2: limit the daily overtime operation hours of line one to 3 hours- P3: Limit the daily overtime operation hours of line two to 4 hours Formulate the problem as a GP model and then solve it by using graphical methodarrow_forward
- The Stratton Company produces two basic types of plastic pipe. Three resources are crucial to the output of pipe: extrusion hours, packaging hours, and a special additive to the plastic raw material. The following data represent next week’s situation. All data are expressed in units of 100 feet of pipe. Product Resource Type 1 Type 2 Resource Availability Extrusion Packaging Additive mix 4 hr 2 hr 2 lb 6 hr 2 hr 1 lb 48 hr 18 hr 16 lb The contribution to profits and overhead per 100 feet of pipe is $34 for type 1 and $40 for type 2. Formulate a linear programming model to determine how much of each type of pipe should be produced to maximize contribution to profits and to overhead, assuming that everything produced can be sold.arrow_forwardA custom motor cycle shop is experiencing high demand from its customers for its services. The owner performs all tasks relating to customization. Assume each customer brings one motor cycle for customization. The owner needs to determine if he needs to add more help to meet customer demand. A week has 40 hours ( maximum amount of time for the owner to work) The maximum number of customizations that can be done per week is 10 bikes ( if there is no wasted time). The following is the data collected from observations for a typical week : Every Friday the shop is cleaned by the owner. This takes 4 hours. - 15 % of the customizations needs rework which takes 50 % more time than regular customization - 10 % of the customers will be called by the owner. This takes 2 hours per customer. Determine OEE. How should the owner handle the business ? Show all formulas used, calculations and results. Do on Blk Bd For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac).arrow_forwardAn order for 200 units of a product is processed on work centers A and B. The set up time on A is 45 minutes and the run time is 5 minutes per piece. The set up time on B is 40 minutes and the run time is 8 minutes per piece. The wait time between the two operations is 2 hours. The move time between A and B is 15 minutes. Wait time after operation B is 1 hour and the move time into stores is 50 minutes. There is no queue at either work station. Calculate the total manufacturing lead time for the order.arrow_forward
- bama pie company's assembly line operations (the assembly line operates for six hundred minutes per day) comprise of eleven tasks, with the longest task time being 2.4 minutes and the shortest task time being 0.4 minutes; the sum of the task times is eighteen minutes. the firm is working on balancing its assembly line operations. the firm needs to produce 200 pies per day; to achieve this, the firm calculates the required cycle time as ---- minutes?arrow_forwardNewTel is a telephone company with a policy of filling positions internally through promotions, rather than hiring from outside. Until recently, the company had a strong engineering focus and tended to promote people to senior executive positions from the engineering areas. Consequently, almost all of the company's 14 senior executives joined the company over 20 years ago as junior engineers. There is increasing pressure on NewTel to become more market and service oriented. As a result, four people were hired last year from firms to fill new senior executive positions in marketing and service departments. The external hires were necessary because current employees were not sufficiently qualified. Now, there are signs of tension among senior executives, particularly during budget deliberations where there is limited discretionary spending on new corporate activities. The four new hires have been thwarted in their attempts to have the company invest more in marketing and customer…arrow_forward4. The seven-person maintenance function at a hospital performs both preventive and corrective maintenance on hundreds of items each month. All the workers are scheduled for 40 hours per week and there are four weeks in a month. It is the goal of the maintenance department to achieve 90% utilization with a mix of two-thirds preventive maintenance and one-third corrective maintenance. How many hours each monthOre spent performing preventive maintenance if they achieve their 90% utilization and correct/preventive mix targets? 6. Focus ר DELLarrow_forward
- A firm that produces wood shutters and bookcases has received two orders for shutters: onefor 100 shutters and one for 150 shutters. The 100-unit order is due for delivery at the startof week 4 of the current schedule, and the 150-unit order is due for delivery at the start ofweek 8. Each shutter consists of two frames and four slatted wood sections. The wood sections are made by the firm, and fabrication takes one week. The frames are ordered, and leadtime is two weeks. Assembly of the shutters requires one week. There is a scheduled receiptof 70 wood sections in (i.e., at the beginning of) week 1. Determine the size and timingof planned-order releases necessary to meet delivery requirements under each of theseconditions:1. Lot-for-lot ordering (i.e., planned-order release equal to net requirements).2. Lot-size ordering with a lot size of 320 units for frames and 70 units for woodsections.arrow_forwardKAPC, a pharmaceutical company located in rural Kansas, is finding it difficult to retain its employees, who frequently leave after just six months of working at KAPC for jobs at pharmaceutical companies paying higher wages in Chicago. To address its problem with labor turnover, human resource officers at KAPC decide to run an experiment. Of their next 100 newly hired employees, 25 will randomly be selected to receive a housing voucher worth up to $4,000 per year to offset property taxes. To take advantage of this program, the employee must not only be randomly selected into the program but she must also purchase a home. Of the 25 employees selected into the housing voucher program, 7 leave KAPC within 12 months of starting. Of the 75 employees not selected into the program, 37 leave KAPC within 12 months of starting.a. Provide a difference-in-differences estimate of the effect the housing voucher program has on retention at KAPC.b. Suppose KAPC spends $10,000 in hiring costs each time…arrow_forwardCompany ZWZ manufactures three products in a serial system; Product XA is manufactured in Stage 1, Product XB in Stage 2, and XC in Stage 3. Product XB has a sales potential in the market; hence, some of it can be sold at the end of Stage 2, and the remaining can be moved to Stage 3. The third stage produces Product XC, and then delivers it to customers. Two units of Product XA produced in Stage 1 are required for each unit of Product XB in Stage 2. In addition, four units of Product XB produced in Stage 2 are required for each unit of Product XC in Stage 3. Stage 1 can only use regular time; however, Stage 2 has the options of using regular time and overtime in manufacturing. On the other hand, Stage 3 has only one alternative, which is subcontracting. The pertinent data are provided below: Stage 2 Stage 1 11 No overtime No subcontracting No sales 0.07 Unit regular time cost (TL) Unit overtime cost (TL) Unit subcontracting cost (TL) Unit selling price (TL) Unit processing time (hrs)…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,