Concept explainers
A
Learn your wayIncludes step-by-step video
Chapter 5 Solutions
Foundation Design: Principles and Practices (3rd Edition)
Additional Engineering Textbook Solutions
Elementary Surveying: An Introduction To Geomatics (15th Edition)
Structural Analysis (10th Edition)
Materials for Civil and Construction Engineers (4th Edition)
Elementary Surveying (14th Edition)
Problem Solving with C++ (10th Edition)
Java: An Introduction to Problem Solving and Programming (7th Edition)
- A fence with dimensions of 15m long by 20m high including portions below NGL. Determine the number of CHB needed using 200x400mm concrete hollow blocks. Consider 5% wastagearrow_forwardA two-story reinforced concrete art museum is to be built using an unusual architecturaldesign. It will include many tile murals and other sensitive wall finishes. The column spacingwill vary between 5 and 8 m. Determine the allowable total and differential settlements forthis building.arrow_forwardPLEASE HELP, Determine the occupant load for the small restaurant. WILL THUMBS UP IF CORRECT.arrow_forward
- Question: Refer to Figure 1 to find the bulk plane and determine the height of Ironman's House. Consider only two street sides (Silver St. and Gold St.), of which the required bulk plane angles are 45°. What is the maximum height of the Ironman's House that satisfies the required building code? Silver St. 10 ft Figure 1 60 ft Property Ironman's House Flat roof building (40 ft x 30 ft) 10 ft setback-all sides Gold St. 20 ftarrow_forward1.) A fence has a dimension of 6 meters long and 10 meters high including the portion below normal grade line. Determine the number of CHB needed using 200mm x 400mm concrete blocks. Include the 10% wastage allowance. choices: 858 780 750 2.) A fence has a dimension of 6 meters long and 10 meters high including the portion below normal grade line. How many bags of lime will be needed for the cement plaster on two faces of well-constructed CHB walls? use Class A 10mm thick plaster. Choices: 9.84 4.92 11.76 Note: please base your answer on the given choices thank youarrow_forwardUse AOA methodarrow_forward
- (a) Discuss the suitability of using either concrete, steel or timber to construct the structure in the given environment, and recommend the type of cross-section. Focus on issues related to sustainability and climate change. see the definition in Durability Cover table in BS Environment: Coastal region Mild conditions Soil sulphate and organic compounds With respect to each material (concrete, steel and timber), discuss what are the advantages and disadvantages if this material were to be used in? How can these materials be protected from such conditions to make it more sustainable? How does climate change effect the use of such materials in the future for design purpose? Times New Roman and Size 12 Font How can chemicals (soil sulphate and organic compounds) attack the given materials (concrete, steel and temper)? And discuss the ways/ techniques to protect concrete, steel and temper from these chemicals. Max 3-4 pagesarrow_forward(b) Timber is to be used in the construction of a single story house. i) Sketch the proposed house. ii) Indicate with justification three (3) possible structural and three (3) non- structural application of timber. iii) What is glu-laminated timber? Explain the suitability of glu-laminated timber to be used in the construction of the house.arrow_forwardThe frontage of a lot is to be fenced using 6in CHB. The client specified that the fence must be fine plastered at both its sides. The fence is to be supported by 25cmx25cm posts at both ends and at every 4m O.C. If the fence is 4m high and 40m long determine the materials needed to complete the project. Use the default class specified for masonryarrow_forward
- Load combinations for LRFD are given in the NSCP 2015 or ASCE 7 as follows. Combination 1: 1.4D Combination 2: 1.2D+1.6L+0.5(L, or S or R) Combination 3: 1.2D+1.6(L, or S or R)+(0.5L or 0.5W) Combination 4: 1.2D+1.0W+0.5L+0.5(L, or S or R) Combination 5: 1.2D±1.0E+0.5L+0.2S Combination 6: 0.9D±(1.0W or 1.0E) Given: D = 107 kN, L = 46 kN, L, = 19 kN, S = 20 kN, E = 50 kN, W = 40 kN Required: Which of the following is the controlling load combination for ASD? Combination 4 O Combination 5 Combination 2 O Combination 1arrow_forward6-6 A one-story warchouse 36 m by 18 m is to be added to an existing plant. An asphalt pavement service area 18 m by 9 m will be added adjacent to the warehouse. It will also be necessary to put in 150 linear m of railroad siding to service the warehouse. Utility service lines are already available at the warehouse site. The proposed warehouse has a concrete floor and steel frame, walls, and roof. No heat is necessary, but lighting and sprinklers must be installed. Estimate the total cost of the proposed addition. Consult App. B of the 4th ed. for necessary cost data.arrow_forwardH.W No.2: A 12 inch circular pipe is to be installed in a positive projection embankment under an unsurfaced roadway and covered with 3.0 feet of 100 pounds per cubic foot backfill material.. Assume a Type 3 Installation. The wall thickness for a pipe with a B wall is 2-inches per ASTM C76 and a 12 inch thick concrete road pavement of 150 pound per cubic foot unit weight. Select: Reinforced pipe classes required pipe strength in terms of 0.01 inch crack D- load. Highway Live Load B.arrow_forward
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning